Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the BCS Test Automation Engineering TAE Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam TAE Premium Access

View all detail and faqs for the TAE exam


468 Students Passed

87% Average Score

94% Same Questions
Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

Consider a TAS that is going to bedeployed for the first time. The TAS requires share resources and run it its own test environment. The infrastructure for the TAS has been created along with maintenance procedures. It is very unlikely the TAS will be required to work in other target

Environments. There is a high-risk that when the TAS is deployed in its own test environment, a number of existing application will no longer work because of conflicts with the existing shared resources.

Which of the following activities would you expect tobe MOST effective at mitigating the risk associated with the first deployment of the TAS?

Options:

A.

Testing the TAS for application compatibility issues in the target environment

B.

Testing the TAS for its ability to be implemented in other target test environments.

C.

Testing the TAS for regressions due to optimization that fix non-functional issues.

D.

Testing the TAS for ITS ability to run a shared test environment

Questions # 2:

Consider the followingexample of TAS metrics.

Time to execute automated tests

Speed and efficiency of TAS components

Which of the following statements is TRUE?

Options:

A.

A and B are both internal TAS metrics

B.

A is an internal TAS metric and B is an external TAS metric

C.

A and b are both external TAS metric

D.

A is and external TAS metric and b is an internal TAS metric

Questions # 3:

Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUT environment. All the preliminary checks toverify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.

Which of the following is NOT a relevant check for achieving your goal in this scenario?

Options:

A.

Checking whether all the test cases contain the expected results

B.

Checking whether the post condition have been fulfilled for all the test cases

C.

Checking whether the loading of the TAS is repeatable in the SUT environment

D.

Checking whether all the test casesproduce repeatable outcomes

Questions # 4:

Consider the following layers of the gTAA structure:

a. Test generation layer

b. Test definition layer

c. Test execution layer

d. Test execution layer

Consider the following capabilities associated with these layers.

Acquire all thenecessary resources before each test and release all after run, in order to avoid interdependences between test

Allow the automated test scripts on an abstract level to interact with components, configurations and interfaces of the SUT.

Design test directives that allow configuring the algorithms used to automatically produce the test cases a given model of the SUT.

Allow the definition and implementation of test cases and data by means of templates and/or guidelines.

Which of the following BEST matches each layer with the appropriate capability?

Options:

A.

a-3, b-4, c-1, d-2

B.

a-4, b-3, c-1, d-2

C.

a-4, b-3, c-2, d-1

D.

a-3, b-4, c-2, d-1

Questions # 5:

Which of the following statement about the implementation of automated regression testing is FALSE?

Options:

A.

When automating regression tests, the structure of automated tests must always be thesame as the corresponding manual tests

B.

When automating regression tests, the corresponding manual tests should have already been executed to verify they operate correctly

C.

When automating regression tests, the initialization steps set the testpreconditions should be automated wherever possible

D.

When automating regression tests, consideration should be given to how much time would be saved by automation

Questions # 6:

Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.

Which of the following would you expect to be the MOST specific risk associated with this scenario?

Options:

A.

The connectivity from the TAS to the dedicatedtest interfaces will not work

B.

The process of configuring the TAS will be error-phone due to manual intervention

C.

The automated test cases will not contain the expected result

D.

False alarms, that are unlikely to occur in the real world, will be observed during testing

Questions # 7:

A SUT has an existing automated test suite.

Which of the following statements relating to the introduction of new features in the SUT is TRUE?

Options:

A.

Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort

B.

The introduction of a new feature could require updates or additions to the testware components

C.

The test automation engineer should work with the business analysts to ensure the new feature is testable

D.

It is generally more difficult to automate test cases for a new feature as the developmenthas not yet started

Questions # 8:

Consider a TAS associated to dynamically changing software frequent releases. Your goal is to determine the amount ofeffort required to maintain the automated tests of the regression test suite for each new release of the SUT.

What is the MOST important metric to collect to achieve your goal?

Options:

A.

The code coverage achieved with the automated tests, for each new release ofthe SUT

B.

The number of automated tests which fail because of a single software defect, for each new release of the SUT

C.

The time it takes to execute all the automated tests, for each new release of the SUT.

D.

The number of automated testsrequiring maintenance, for each new release of the SUT.

Questions # 9:

Which of the following statements does NOT describe good practice for maintaining the TAS?

Options:

A.

The TAS must run in the development environment because development and programming knowledge are required for its maintainability

B.

The TAS must be under configuration management, along with the test suite, the testware artefacts and the test environment in which it runs

C.

The TAS must separate the test scripts from the environment in which it runs and from the associated harnesses and artefacts

D.

The TAS must consist of components that can be easily replaced without affecting the overall behavior of the TAS itself

Questions # 10:

Which of the following statements about the reuse of TAS artefacts is TRUE?

Options:

A.

Reusable TAS artefacts can include components (or parts of components) associated with different layers of the TAA

B.

To enable reuse of TAS artefacts, a good design for reuse is built into the TAA and to further action are needed during the TAS lifecycle

C.

Communications maintenance and improvements for reusing TAS artefacts are modify addressedduring the design of the TAA

D.

Reusable TAS artifacts associated with the definition layer of the TAA include the adaptors to the SUT components and/or interfaces

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.