Questions # 1:

Where is the recommended location for remote power panels?

Options:

A.

at one or both ends of an equipment row

B.

outside the building

C.

inside a sealed room

D.

suspended from ceiling

Questions # 2:

What is a possible downside to customer-owned maintenance holes?

Options:

A.

fire risk near data center property

B.

susceptibility to theft or damage by unauthorized personnel

C.

poor aesthetic appearance around facility exterior

D.

leaks leading to water infiltration into data center

Questions # 3:

What is the Typical Voltage Of A Utility Sub-Station?

Options:

A.

Low voltage at 480 or less volts

B.

Medium to Low-voltage range between 270 to13 800 volts

C.

High voltage at a stunningly high rate

D.

The United States uses only Direct Currents DC

Questions # 4:

What are the 3 different methods for grounding racks in a computer room?

Options:

A.

Ground bus, direct connections, bond to rack

B.

Ground conductor, surge protection, equipment rack

C.

Copper cable, conduit, flexible connector

D.

AC power, DC power, Ethernet

Questions # 5:

What is recommended size ratio of Secure Storage Area?

Options:

A.

5% of Computer Room Space

B.

10% or greater than Available Floor Space

C.

15-20% more than Computer Room's Cross Sectional Area

D.

10% of Computer Room's Net Square Footage

E.

None Of These

Questions # 6:

What is the minimum slab floor to ceiling height recommended?

Options:

A.

12feetminimum

B.

14feetminimum

C.

15feetminimmum

D.

16feetminimum

Questions # 7:

What is the flame index spread rating required for all materials hosted in a containment system?

Options:

A.

0

B.

10

C.

25

D.

50

Questions # 8:

What are two functions of telecommunications entrance room?

Options:

A.

to provide a secure area where access provider outdoor cable can be converted, to indoor cable, and, house access provider owned equipment

B.

to house all company-wide communication devices

C.

to store backup telecommunication devices

D.

none of these

Questions # 9:

What IBC occupancy category are data centers placed in?

Options:

A.

Category 3

B.

Category 4

C.

Category5

D.

category6

Questions # 10:

What is the appropriate fire rating requirements for a command center?

Options:

A.

1/2 hour

B.

1 hour

C.

2 hours

D.

3 hours

Viewing page 1 out of 5 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.