Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the CIDQ Interior Design Certification IDPX Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam IDPX Premium Access

View all detail and faqs for the IDPX exam


344 Students Passed

93% Average Score

90% Same Questions
Viewing page 1 out of 6 pages
Viewing questions 1-10 out of questions
Questions # 1:

The purpose of shop drawings is to

Options:

A.

Analyze the fabrication method

B.

Approve completeness of the details

C.

Check conformance with the design intent

Questions # 2:

What is the PRIMARY benefit for incorporating a design firm?

Options:

A.

Limit liability of the principals

B.

Shelter company’s profits from taxes

C.

Enhance company availability to credit

D.

Protect company from negligence suits

Questions # 3:

What method of payment for interior design services poses the least financial risk to the designer?

Options:

A.

time-based fee

B.

fixed design fee

C.

value-based fee

D.

retail sales-based fee

Questions # 4:

Which of the following installations would require a structural engineer to be involved?

Options:

A.

A wall-mounted furniture workstation

B.

A demountable partition wall

C.

A non-load-bearing interior wall

D.

An operable partition wall

Questions # 5:

Which project delivery method involves two separate contracts: one with the designer and one with the general contractor?

Options:

A.

design-build

B.

design-bid-build

C.

integrated project delivery

D.

construction management at risk

Questions # 6:

Which elements are MOST important when preparing resilient sheet flooring estimates?

Options:

A.

Seaming diagram, roll width, and door thresholds

B.

Roll width, room dimensions, and seaming diagram

C.

Room dimensions, roll width, and location of columns

D.

Door thresholds, room dimensions, and location of columns

Questions # 7:

During a high school renovation project, the school board and several teachers each call the designer several times a week to request changes. What is the BEST way for the interior designer to keep the project on schedule?

Options:

A.

Send a weekly summary of calls, emails, and meetings to the stakeholders

B.

Ask the client to establish a point person and a clear line of internal decision-making

C.

Set up a weekly meeting with all stakeholders to discuss all of their proposed changes

D.

Talk to each stakeholder and take the time to incorporate all of the changes they request

Questions # 8:

What is the MAXIMUM occupant load of a business occupancy with one exit?

Options:

A.

49

B.

50

C.

69

D.

70

Questions # 9:

Upon completion of a project, what documents would the designer retain for their files?

Options:

A.

Record (as-built) drawings and specifications

B.

Post-occupancy evaluation and specifications

C.

Record (as-built) drawings and inspection report

D.

Post-occupancy evaluation and inspection report

Questions # 10:

A corporate client tells their designer that they will be purchasing all of their ancillary furniture directly, and would only like the designer’s assistance with the remaining pieces. Which of the following would be in the designer’s scope to specify?

Options:

A.

Reception sofa

B.

Break room barstools

C.

Open office workstations

Viewing page 1 out of 6 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.