Questions # 1:

A deployment engineer is installing a PowerEdge XE8640 server. The server is on a lift, and they have aligned the server inner rails with the rail assemble that are secured in the rack. The engineer

can only push the server into the rack a short distance before it stops. Pushing forcefully causes the rack to slide back.

What action should the deployment engineer take?

Options:

A.

Press the mechanism on the rail to release the rail lock.

B.

Lower the lift and move away from the server.

C.

Pull the server out of the rack and realign the lift with the rack.

D.

Have a person hold the rack while using force to slide in the server.

Questions # 2:

A deployment engineer is installing a PowerEdge XE8640 server in a rack with round holes. They cannot get the outer rail portion to fit flush with the rack frame.

What is the reason the outer rail is not flush with the frame?

Options:

A.

The rail latch is not engaged.

B.

The PowerEdge XE8640 does not support a round-hole rack.

C.

A small offset is expected between the rail mounting post and the rack.

D.

Weight has not been applied to the rail.

Questions # 3:

A deployment engineer installed and powered on a XE8640 server. The Linux operating system is installed. They need to update the drivers on the server.

What is a consideration before updating the driver?

Options:

A.

A single graphics driver supports all modern GPUs.

B.

Each GPU model has a distinct driver package.

C.

The driver package only supports Windows operating systems.

D.

You can upload the driver package using the iDRAC UI.

Questions # 4:

A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables that route to switches in the data center. The administrator questions the use of a cablemanagement arm (CMA).

What are two items to consider when installing a CMA?

Options:

A.

The CMA can be installed to open on either the left or right side of the server.

B.

Do not route optical cables through the CMA.

C.

A CMA can only be installed with a strain relief bar.

D.

The XE9680 does not support a CMA.