Questions # 1:

PowerFlex Management Controller VMs are being deployed. Once the OVAs have been successfully deployed, what should be done before powering them on?

Options:

A.

Upgrade the VM hardware version.

B.

Add a second SCSI controller to all the PFMC 2.0 nodes.

C.

Add a second vNIC to all the PFMC 2.0 nodes.

D.

Upgrade the version of VMware Tools.

Questions # 2:

How many days may a PowerFlex cluster remain in a production environment after deployment before a license is required for continued operation?

Options:

A.

30 days

B.

120 days

C.

90 days

D.

60 days

Questions # 3:

What is the minimum number of nodes required to create a production PowerFlex Management Platform Cluster?

Options:

A.

9

B.

1

C.

5

D.

3