A drive in a 3D + 1P RAID group fails in a VSP G700 and there is no spare drive available.
Which two actions are automatically performed by the system? (Choose two.)
Which two tools are available to configure NTP server settings on a VSP E590 system? (Choose two.)
Which tool do you use to install license keys on a VSP G370 system?
How many batteries does a VSP E1090 have per controller (CTL)?
A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?
Which program is used to perform the “New Installation” procedure on a VSP F700 system?
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?
A customer has a VSP G370 with the encryption license key installed. They now want to have all the DP-Volumes of a certain pool located on encrypted RAID Groups.
What are two requirements? (Choose two.)
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?
What are two valid back-end SAS cable connections on a VSP midrange system? (Choose two.)