Spring Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the International Code Council Commercial Inspector M2 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam M2 Premium Access

View all detail and faqs for the M2 exam


499 Students Passed

96% Average Score

94% Same Questions
Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

When a furnace is installed in a 66-inch-high attic, the maximum distance from the passageway access to the furnace shall be _____ ft., measured along the centerline of the passageway.

Options:

A.

10

B.

15

C.

20

D.

50

Questions # 2:

What is the maximum distance allowed below the design flood elevation from which ventilation may be obtained?

Options:

A.

0 inches

B.

6 inches

C.

1 foot

D.

2 feet

Questions # 3:

Given: single-wall vent, which serves only one appliance, and has a height of 10 feet.

The maximum horizontal length permitted for a 5-inch diameter vent connector serving this vent is _____ feet.

Options:

A.

5

B.

7.5

C.

9

D.

10

Questions # 4:

Exhibit:

Question # 4

What hp is EF-2?

Options:

A.

1/2

B.

1

C.

1.5

D.

2

Questions # 5:

An equipment shutoff valve shall be in the same room and not more than how many feet away from the appliance?

Options:

A.

6

B.

7

C.

8

D.

9

Questions # 6:

Given: An industrial water heater boiler has a manufacturer’s listing of 18 inches wall clearance. It is installed with a protective wall assembly of 24-gauge sheet metal spaced out 1 inch from the wall.

The reduced installation clearance from the wall for this appliance is _____ inches.

Options:

A.

[option text not fully visible in the material you sent]

B.

[option text not fully visible in the material you sent]

C.

12

D.

18

Questions # 7:

When a permit is issued, the code requires that one set of approved plans and specifications be returned to the applicant.

This set of plans and specifications shall be:

Options:

A.

kept on the building site.

B.

returned to the architect.

C.

filed with the county clerk or jurisdiction to properly record the property.

D.

retained by the applicant for at least one year after the job is finished in the event modifications are made.

Questions # 8:

Solid-fuel cooking equipment:

Options:

A.

shall be vented through a separate hood and exhaust system.

B.

is permitted to be installed under Type II canopy-type hoods.

C.

is permitted to be installed under Type II noncanopy-type hoods.

D.

is permitted to be installed under common canopy-type hoods with other cooking equipment.

Questions # 9:

Infrared radiant heaters shall be installed:

Options:

A.

in accordance with UL 2158.

B.

in accordance with UL 1240.

C.

with a 6-ft. clearance on all sides.

D.

with clearances from combustible material in accordance with the manufacturer’s installation instructions.

Questions # 10:

When testing dampers located in corridors, the dampers shall demonstrate acceptable closure performance when subjected to _____ fpm velocity across the face of the damper using the UL 555 fire exposure test.

Options:

A.

75

B.

100

C.

150

D.

200

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.