Pass the NABCEP Board Certifications PVIP Questions and answers with ExamsMirror
Exam PVIP Premium Access
View all detail and faqs for the PVIP exam
464 Students Passed
88% Average Score
97% Same Questions
According to the NEC, where on a residential PV system MUST the labeling describing the type of rapid shutdown be located?
A PV array’s output drops by 8% due to shading from 10 AM to 2 PM. If unshaded output is 12 kW, what is the shaded output?
A tap conduct is to be connected to a feeder supplied by both a utility service source and a utility-interactive inverter source. The feeder utility source is a 400A breaker in a service panel, the inverter overcurrent protection device is rated at 100A, and the inverter continuous output current is 72. The tap conductor that is to be installed will be 17 ft. long. It will be located in a raceway and will supply a subpanel with a 50A main breaker.
What is the MINIMUM required ampacity of the tap conductor?
A homeowner is weighing the PV module options for a roof-mounted solar array. Which is a correct option to present to the homeowner?
A metal condult containing an array circuit with Vmo of 400Vdc is connected to a metal enclosure at the location where the concentric knockouts have been punched by the manufacturer. Which method of attachment should be used?
An installer troubleshooting a ground-mounted array finds It to be performing as expected most of the time, but a ground-fault error is indicated on hot days. The inverter is in a shaded location. Which of the following should the installer check for FIRST when troubleshooting this array?
A PV system interconnects at a 480V three-phase service. The inverter output current is 20A per phase. What is the minimum size of the equipment grounding conductor (EGC) per NEC 250.122 if the OCPD is 30A?
A module’s power is 340W at STC. At 700 W/m² and 40°C with a coefficient of -0.38%/°C, what is the output?
A PV system is installed on a dwelling with a single-phase 240V service. The inverter output is 7.2 kW. What is the minimum service conductor size per NEC 705.12 if the existing load is 50A?
Which of the following is an NEC-indicate means to identify PV source and output circuits at accessible points of termination connection, and splices?