Questions # 1:

The main goals on a large project are ease of communication and commitment from the project team.

Which scheduling technique should be used?

Options:

A.

Milestone chart

B.

Interactive bar chart

C.

Critical path method

Questions # 2:

The architect's estimate of the cost of the work at the end of the construction documents phase exceeds the owner's stated budget for the cost of the work.

According to AIA Document B101, what should the architect recommend to the owner?

Options:

A.

Change the quality of materials, with additional compensation

B.

Make reductions in the project program, with additional compensation

C.

Revise project scope, without additional compensation

D.

Alter the project delivery method, without additional compensation

Questions # 3:

Question # 3

Prior to the project kick-off, the architect requests to add an additional week of review time to the schedule for each design submission for coordination with their consultants. Based on the schedule provided, what is the earliest start date for construction with the additional review periods?

Options:

A.

October 4

B.

October 11

C.

October 25

D.

November 1

Questions # 4:

The construction documents for a new multi-tenant office building are 90% complete. The owner requests that the bid documents include the rough-in of security camera locations and access control points for the building.

Which changes should the architect consider? Check the three that apply.

Options:

A.

Adjusting the Project schedule for delivery of documents and bidding

B.

Lengthening the scheduled bidding time frame due to additional work

C.

Revising the Design Fee agreement for additional services

D.

Revising the consultant services agreement for a change in scope

E.

Documenting the security system on the building permit application

F.

Revising the Construction Manager services for the expanded scope

Questions # 5:

An architect is working on a design-build project for a large skyscraper. The architect has completed a conceptual design, finalized the contracts, and hired consultants. The schematic design phase is set to begin in one week.

Which items or tasks are important for the architect to complete during this time? Check the three that apply.

Options:

A.

Send consultants project constraints

B.

Prepare building permit application

C.

Identify FF&E vendors

D.

Create a project schedule

E.

Ask consultants to review information and provide input

F.

Coordinate the curtain wall detailing with the envelope

Questions # 6:

Which document defines the architect’s scope of services and responsibilities?

Options:

A.

Owner-Architect Agreement (B101)

B.

General Conditions (A201)

C.

Contractor’s Bid Proposal

D.

Construction Documents

Questions # 7:

Which project delivery method allows the owner to engage the architect, contractor, and key consultants in a single collaborative contract?

Options:

A.

Design-Bid-Build

B.

Construction Manager at Risk (CMAR)

C.

Design-Build

D.

Integrated Project Delivery (IPD)

Questions # 8:

Question # 8

Design Firm ABC is awarded two projects, but they do not have enough staff to support the execution of both projects due to unexpected staffing issues. ABC is deciding if they need to hire staff from an outside firm to execute the projects.

Which one of the following sets of staff members would adequately support ABC's staffing needs?

Options:

A.

1 Lead Architect, 1 Drafter

B.

2 Designers

C.

1 Designer, 1 Drafter

D.

2 Drafters

Questions # 9:

According to AIA Document B201, the architect must perform which of the following services during Construction Contract Administration?

Check the three that apply.

Options:

A.

Prepare construction contracts

B.

Prepare bid evaluation report

C.

Make decisions related to aesthetic effect

D.

Review the program furnished by the owner

E.

Visit the site during appropriate stages of construction

F.

Be a representative of and give advice to the owner

Questions # 10:

What type of contract involves payment based on actual costs plus a fee?

Options:

A.

Lump Sum Contract

B.

Cost-Plus Contract

C.

Unit Price Contract

D.

Time and Materials Contract