Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror
Pass the Nutanix NCP-BC NCP-BC-7.5 Questions and answers with ExamsMirror
Exam NCP-BC-7.5 Premium Access
View all detail and faqs for the NCP-BC-7.5 exam
441 Students Passed
96% Average Score
91% Same Questions
An administrator is concerned about the operational overhead of manually creating and managing categories across both the primary and recovery sites to ensure Recovery Plans function correctly during failover and failback. What Nutanix Disaster Recovery behavior minimizes this concern?
An administrator executes an Unplanned Failover. The VMs recover at the Recovery Site and are powered on. However, the application owners report that the VMs are completely isolated and cannot communicate with any other services on the network. The administrator checks the Recovery Plan and notices the Network Mapping section was left blank.
What is the expected configuration for VMs recovered without a valid Network Mapping?
A remote office deployment consists of a two-node Nutanix hybrid cluster. An administrator attempts to configure a protection domain with a 5-minute RPO (Nearsync) replicating to a central datacenter.
Why is the administrator unable to successfully configure this Nearsync schedule?
An administrator is managing a mission-critical Inventory-VM that is part of a Protection Domain (PD) named PD_Production.
Monday: A scheduled snapshot of PD_Production is successfully taken.
Tuesday: Due to a configuration error during a cleanup task, the administrator accidentally removes Inventory-VM from the PD_Production Protection Domain. The VM continues to run, but it is no longer being snapped or replicated.
Wednesday: A database corruption occurs on Inventory-VM. The administrator finds the local snapshot from Monday and performs an In-place Restore (Revert) to recover the data.
Following the successful completion of the In-place Restore, what is the status of Inventory-VM regarding its data protection?
A Protection Policy is configured with a Nearsync replication schedule (15-minute RPO). An administrator observes that the system has temporarily transitioned to an hourly replication schedule. Which scenario would cause this automatic transition from Nearsync to Asynchronous (hourly) replication?
An administrator performs these steps while configuring Nutanix Disaster Recovery:
Create VMs on Site A in a container named SalesA
Create a new container on Site B named SalesB
Create new Protection Policy name Async
Place all the new Sales VMs in the Protection Policy named Async
Set a schedule to begin taking hourly snapshots immediately
After performing the steps, replications begin without any errors. After two hours, the administrator checks on the progress on the remote site and finds that the SalesB container is showing 0 bytes.
What went wrong?
A VM is protected in an Async Protection Policy and added to a Recovery Plan. An administrator is attempting to perform a planned failover of the VM. How many recovery points are created and replicated during the planned failover process?
An organization requires a maximum data loss of 15 minutes for a Tier-1 application running on Nutanix AHV. Which configuration best meets this requirement?
An administrator plans to configure Cross Hypervisor Disaster Recovery (CHDR) to replicate VMs from an ESXi cluster to an AHV cluster using an Asynchronous replication schedule. Which component must be installed on the VMs to ensure successful migration and driver configuration during recovery?
Which combination of Replication Schedules within the same Recovery Plan will cause the recovery to fail?
TOP CODES
Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.