Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the Oracle Exadata 1z0-902 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam 1z0-902 Premium Access

View all detail and faqs for the 1z0-902 exam


433 Students Passed

90% Average Score

94% Same Questions
Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
Questions # 1:

You have been notified by your Network Administrator that an upstream switch has been replaced due to a hardware fault. Which command verifies that the client network on your Exadata X9M-2 Database Server is available via both client switches?

Options:

A.

ifconfig -a legrep "re0| re1"

B.

/opt/oracle.SupportTools/ibdiagtools/checkbadlinks.p1 —all

C.

netstat -rn

D.

cat /proc/net/bonding/bondeth0

Questions # 2:

A new Exadata Quarter Rack with 2 Database Servers and 3 HC Storage Servers and 3-phase 15kVA PDUs is being installed in a Data Center. However, the Data Center is only providing enough power for a single cable from each PDU.

Which statement is correct?

Options:

A.

The installation can go ahead, no change is required.

B.

The installation cannot proceed until two power feeds are available per PDU.

C.

A splitter cable can be used to provide power to all PDU cables.

D.

The power cables from the servers to the PDUs can be rearranged inside the rack following OECA guidance to utilize a single PDU power cable.

Questions # 3:

An Exadata storage server physical disk on an X9M-2 high-capacity full rack entered the predictive failure state. Which two steps must you perform to replace this failed physical disk?

Options:

A.

Replace the failed physical disk.

B.

Add the griddisks back into the ASM diskgroup they used to be a member of.

C.

Identify the griddisks located on the failed physical disk and drop them from the associated ASM diskgroups.

D.

Rebalance the data on the effected griddisks before performing a manual drop command.

E.

Create a new celldisk and new griddisks on the replaced physical disk.

F.

Verify that the griddisks located on the physical disk have been successfully dropped from the associated ASM diskgroups.

Questions # 4:

Which dbmcli command is NOT valid on Exadata X9M?

Options:

A.

dbmcli -e "LIST METRICHISTORY WHERE name LIKE 'DS_.*’”

B.

dbmcli -e "LIST METRICCURRENT WHERE name = 'DS_TEMP’ ”

C.

dbmcli -e "LIST IBPORT DETAIL"

D.

dbmcli -e "LIST ALERTHISTORY WHERE agelnMinutes < 15"

Questions # 5:

You have configured a multirack Database Machine with two X9M-8 full racks all in a single cluster and storage grid comprising a total of 4 X9M-8 Database servers and 28 X9M-8 Storage servers.

Which two options are true regarding the servers on which Enterprise Manager agents must be deployed in order to monitor all components of this multirack configuration?

Options:

A.

on at least two storage servers in both racks

B.

on only one database server in both racks

C.

on all database servers in the first rack

D.

on all storage servers in both racks

E.

on all database servers and at least two storage servers in both racks

F.

on all database servers in the second rack

G.

on all database servers in both racks and one storage server in each rack

Questions # 6:

You plan to monitor the status of the motherboard, memory, power, fans, and network cards on the database nodes in your Exadata Database Machine using Enterprise Manager.

Where must you set the thresholds for these hardware components and why, to assure that sensor readings, faults, and any related alerts, are visible in Enterprise Manager?

Options:

A.

No thresholds need to be set because they are preset in the ILOM and in Enterprise Manager

B.

Set thresholds in ILOM and in Enterprise Manager because they are not preset anywhere and must be set in both places.

C.

Set thresholds only in ILOM because they are not preset anywhere but need to be set only in ILOM.

D.

No thresholds need to be set because they are preset in the ILOM and these are sufficient for monitoring.

Questions # 7:

Which two statements are true about the types of Exadata X9M-2 storage servers: the High Capacity (HC) storage server, the Extreme Flash (EF) storage server and the Extended server?

Options:

A.

The HC storage server contains 12 x 18 TB hard disks, 4 x 6.4 TB PCIe flash cards, and 1.5 TB Persistent Memory.

B.

The XT storage server is an all-disk storage server with no flash, containing 12 x 18 TB hard disks, and 1.5 TB Persistent Memory.

C.

The EF storage server contains 8 x 6.4 TB PCIe flash cards.

D.

The EF storage server contains 8 x 6.4 TB PCIe flash cards and 756 GB Persistent Memory.

E.

The EF storage server contains 8 x 6.4 TB PCIe flash cards, and can be upgraded with 4 more for a total of 12.

Questions # 8:

Which of the following is NOT a requirement when validating, receiving, unpacking, and planning access route and space requirements for Exadata Database Machine?

Options:

A.

The entire access route to the installation site should be free of raised-pattern flooring that can cause vibration.

B.

914mm of space required above the rack height is required for maintenance access.

C.

The incline of any access route ramp must be less than or equal to 6 degrees.

D.

All four leveling and stabilizing feet should be raised and out of the way prior to moving the rack.

E.

Oracle Exadata Rack may only be installed on raised floor environments.

F.

A conditioned space is required to remove the packaging material to reduce particles before entering the data center.

Questions # 9:

Which three statements are true about the Grid Infrastructure configuration after a nonvirtual deployment of a new Exadata Database Machine with a single cluster?

Options:

A.

Three Single Client Access Name (SCAN) listeners are configured on the RDMA over Converged Ethernet (RoCE) network.

B.

The OCR is multiplexed in the DATA_ and RECo_ diskgroups.

C.

Grid Infrastructure uses the management network as the cluster interconnect.

D.

The ora. diskmon clusterware resource is enabled and online.

E.

Three Single Client Access Name (SCAN) listeners are configured on the client access network.

F.

Grid Naming Service (GNS) is not configured.

Questions # 10:

Which two steps concise the path used to communicate with Enterprise Manager from an Exadata Database Machine?

Options:

A.

SNMP traps for alerts are sent by the storage server RS process to the storage server ILOM.

B.

SNMP traps for alerts are sent by the storage server MS process to the storage server ILOM.

C.

SNMP traps for alerts are sent by the storage server ILOM to the storage server is process.

D.

SNMP traps for alerts are sent by the storage server MS process to the Enterprise Manager agent.

E.

SNM? traps for alerts are sent by the storage server ILOM to the Enterprise Manager agent.

F.

SNMP traps for alerts are sent by the storage server ILOM to the storage server MS process.

G.

SNMP traps for alerts are sent by the storage server RS process to the Enterprise Manager agent.

Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.