Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the SAP Certified Associate C_ACDET_2506 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam C_ACDET_2506 Premium Access

View all detail and faqs for the C_ACDET_2506 exam


437 Students Passed

95% Average Score

91% Same Questions
Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

Which scenarios are applicable when moving templates from the test site to the production site by Intelligent Configuration Manager (ICM)? (Select 2 correct answers)

Options:

A.

Draft templates on the source site are skipped.

B.

Batch imports are available for templates when migrating configuration bundles.

C.

New templates that successfully migrated to the production site are in Draft state.

D.

Published templates with flex master data references in the test site are migrated to the production site during the first migration attempt.

Questions # 2:

What is the recommended order of operations for creating a required Flex Master Data (FMD) type field in a project header?

Options:

A.

1. Create the FMD template 2. Create the FMD type field 3. Load the data

B.

1. Create the FMD template 2. Load the data 3. Create the FMD type field

C.

1. Load the data 2. Create the FMD type field 3. Create the FMD template

D.

1. Create the FMD type field 2. Create the FMD template 3. Load the data

Questions # 3:

A standard field is not available in reporting. A Greenfield customer needs to be able to report on the data captured in that standard field. How can this be achieved?

Options:

A.

The system makes all fields reportable after a system refresh.

B.

Create a custom field that can be marked reportable, default the custom field to the standard field value, publish, and then pull the field into reporting.

C.

All standard fields are reportable by default.

D.

Under Field Configurations, search for the field in the appropriate class, mark the field reportable, save and publish.

Questions # 4:

Which syntax is used for writing custom Validity Conditions?

Options:

A.

Python

B.

Scheme

C.

Regular expression

D.

XML

Questions # 5:

How can you set the order of your custom Contract Workspace fields? (Select 2 correct answers)

Options:

A.

Select Field Configuration, find the class, and select the Layout tab. Drag and drop the order of the fields, then publish.

B.

Navigate to the UI where the class is presented, select Customize in the banner, edit, and drag and drop fields, then publish.

C.

Fields are presented in alphabetical order of the field label.

D.

Select Field Configuration and under the Advanced tab set the Sequence property, then publish.

Questions # 6:

You can choose multiple field configurations and migrate them to the production site by creating a package in your test site. Which of the following steps should be included? (Select 3 correct answers)

Options:

A.

Discard any other packages that appear in My Action Items.

B.

If you are migrating fields that are associated with enumerations, you should load those enumerations in the production site before migrating the fields.

C.

Make sure you update the string resource files in the production site before migrating the corresponding configurations from test to production site.

D.

Publish the form template within the test site in order to add the form fields in the package.

E.

The Flex Master Data (FMD) templates must be defined and their data should be loaded in the production site before migrating FMD custom fields.

Questions # 7:

During a Bluefield migration, you discover missing flex master data templates. What do you do?

Options:

A.

Use reporting workaround

B.

Rebuild them manually in production

C.

Defer to post-go-live

D.

Ignore them

Questions # 8:

What does the “?” represent in the Ariba expression below?

HierarchicalType=="SubAgreement" ? false : true

Options:

A.

else

B.

replace

C.

then

D.

if

Questions # 9:

When preparing to load legacy contracts during a Bluefield deployment in SAP Ariba Contracts, which of the following actions are required to ensure a successful migration?

Options:

A.

Create a new customized contract upload process specifically for Bluefield deployments to accommodate differences in site structure.

B.

Manually enter legacy contract data into SAP Ariba Contracts using the application’s UI instead of using import tools.

C.

Use the exact same process and tools as used in the Greenfield migration scenario to upload legacy contracts.

D.

Skip the legacy contract upload step if the Production site already contains migrated Flex Master Data Templates.

Questions # 10:

The full SAP Ariba Strategic Sourcing suite baseline (Greenfield baseline scenario) has been applied to the customer Test site. The customer and project team will configure SAP Ariba Sourcing and deploy that to the Production site, then configure and deploy the remaining solutions in stages. What does this mean for subsequent migration activities?

Options:

A.

Subsequent migration activities follow Bluefield deployment scenario.

B.

Subsequent migration activities will require a complete reconfiguration of existing solutions.

C.

Both SAP Ariba Sourcing as well as subsequent migration activities would be Brownfield deployments.

D.

If the baseline applied the full suite, the full suite must be configured and migrated to production at the same time.

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.