Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the SAP Certified Application Associate C_S43_2022 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam C_S43_2022 Premium Access

View all detail and faqs for the C_S43_2022 exam


451 Students Passed

86% Average Score

92% Same Questions
Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
Questions # 1:

You want to display vehicle-specific data for a piece of equipment. How do you proceed?

Options:

A.

Set the relevant flags in Customizing activity "Define Additional Business Views for Equipment Categories".

B.

Assign a view profile to the combination of vehicle type and equipment category.

C.

Assign a view profile to the combination of equipment category and vehicle class.

D.

Assign a view profile to an equipment category for fleet equipment.

Questions # 2:

The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

Options:

A.

Open reservations can be cleared when a maintenance order operation is finally confirmed.

B.

Reservations are created only after a material availability check has been performed

C.

For the combination of order type and planner group, you can decide when reservations are created

D.

All open reservations are closed when the maintenance order is set to TECO.

Questions # 3:

How do you set up the visible tiles for a specific user in SAP Fiori Launchpad? Note: There are 2 correct answers to this question

Options:

A.

By assigning a PFCG role with an SAP Fiori catalog

B.

By assigning a portal role with an SAP Fiori catalog

C.

By assigning a PFCG role with an SAP Fiori tile group

D.

By assigning the tiles directly

Questions # 4:

Which objects can you assign to a Maintenance Service Order Item? Note: There are 2 correct answers to this question.

Options:

A.

Service Product

B.

DIP Profile

C.

Service Work Center

D.

Service Master Record

Questions # 5:

How does a performance-based maintenance plan calculate the interval between start date and planned date?

Options:

A.

Cycle length divided by (monthly performance x 12)

B.

Cycle length divided by annual performance

C.

Cycle length divided by ((scheduling period) x (cycle modification factor))

D.

Cycle length divided by (annual performance/365)

Questions # 6:

Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question

Options:

A.

Plan repair work for the responsible work center

B.

Assign a production resource tool (PRT) to the operation

C.

Complete the malfunction report

D.

Verify planned and actual costs

E.

Find malfunction records already created in a list

Questions # 7:

Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note: There are 3 correct answers to this question

Options:

A.

SAP Service and Asset Manager provides single sign-on functionality.

B.

SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP

C.

SAP Service and Asset Manager can be used offline.

D.

SAP Service and Asset Manager is available only for the iOS platform.

E.

SAP Service and Asset Manager can run on smart watches.

Questions # 8:

What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question

Options:

A.

Add a serialized material to the equipment serial data view.

B.

Assign a serial number profile to an additional business view for equipment category

C.

Assign a serial number profile to the equipment category

D.

Assign a serial number profile to the related material master.

E.

Maintain a serial number for an existing equipment master.

Questions # 9:

Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?

Options:

A.

Technical objects

B.

Work orders and operations

C.

ESRI Maps

D.

Cost analytics

E.

Breakdown analytics

Questions # 10:

You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?

Options:

A.

Scheduling indicator

B.

Scheduling period

C.

End Date for Scheduling

D.

Call horizon

Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.