Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the SAP Certified Application Associate C_TS422_2021 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam C_TS422_2021 Premium Access

View all detail and faqs for the C_TS422_2021 exam


394 Students Passed

97% Average Score

96% Same Questions
Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
Questions # 1:

Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

Options:

A.

Planed delivery time

B.

Operation duration

C.

In-house production time

D.

Total replenishment lead time

Questions # 2:

Which chart types does the tabular planning table provide in SAP S/4HANA

Options:

A.

Order (pool) chart

B.

Work center capacities chart

C.

Capacity requirements chart

D.

Order (dispatched) chart

Questions # 3:

Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Non-stock item

B.

Work item

C.

Variable-size item

D.

WBS item

Questions # 4:

Which time elements are part of a routing operation?

Options:

A.

Pick/pack time

B.

Float before production

C.

Queue time

D.

Wait time

E.

Move time

Questions # 5:

Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

Options:

A.

Planning with final assembly (40)

B.

Make-to-order production (20)

C.

Make-to-stock production (10)

D.

Planning without final assembly (50)

Questions # 6:

You want to use capacity availability checks for production orders. Which settings have to be made for this?

Options:

A.

A checking rule must be assigned in the checking control

B.

The PRT Availability Check must be set in the checking control.

C.

An overall profile must be assigned in the checking control.

D.

The Relevant for Finite Scheduling indicator must be set

Questions # 7:

What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

Options:

A.

Material Requirements Planning (MRP)

B.

Capacity Requirements Planning (CRP)

C.

Supply Network Planning (SNP)

D.

Demand Planning (DP)

Questions # 8:

You want to create a production order from a planned order. What methods could you use?

Options:

A.

Combined conversion

B.

Partial conversion

C.

Collective conversion

D.

Order release

Questions # 9:

You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?

Options:

A.

Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator

B.

Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator

C.

Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator

D.

Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator

Questions # 10:

What type of time element can be reduced by strategy settings while dispatching?

Options:

A.

Transportation time

B.

Wait time

C.

Queue time

D.

Setup time

Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.