Questions # 1:

Which business processes are affected by settings in the order type-dependent parameters? Note: There are 2 correct answers to this question.

Options:

A.

Schedule production orders.

B.

Check material availability.

C.

Select master data.

D.

Define integration with cost accounting.

Questions # 2:

What data can you maintain in the sub-items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Quantity

B.

Status

C.

Installation point

D.

Scrap percentage

Questions # 3:

What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?

Options:

A.

The MRP run assumes external procurement.

B.

The MRP run assumes in-house production.

C.

The MRP run plans the material only if a quotation has been maintained.

D.

The MRP run does NOT consider the material; it has to be planned interactively.

Questions # 4:

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.

Options:

A.

Use batch determination.

B.

Use the Batch Information Cockpit.

C.

Use the batch where-used list.

D.

Use batch derivation.

Questions # 5:

For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

Options:

A.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

B.

The consistency check must be performed.

C.

The assigned routing and bill of material (BOM) must be valid in the entire validity period.

D.

The assigned routing and bill of material (BOM) must have the same validity period.

E.

The lot size range must be within the lot size range of the assigned routing.

Questions # 6:

Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

Options:

A.

You can use trigger points to automatically create rework orders via confirmations.

B.

You can use mass processing to set production orders to technically complete.

C.

You can use the production scheduling profile to automatically set orders to technically complete.

D.

You can use mass processing to read PP master data for production orders.

Questions # 7:

Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.

Options:

A.

Planned delivery time

B.

Total replenishment lead time

C.

Operation duration

D.

In-house production time

Questions # 8:

How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

Options:

A.

Select a special procurement type inside the material master.

B.

Use a special item category in your material BOM (bill of material).

C.

Select a special MRP type inside the material master.

D.

Define the special procurement type inside the material BOM (bill of material).

Questions # 9:

You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

Options:

A.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator.

B.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.

C.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.

D.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator.

Questions # 10:

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

Options:

A.

First in first out (FIFO)

B.

Simultaneous

C.

Manual maintenance

D.

100% check