Questions # 1:

What are three opportunities for creating collaboration on a team? (Choose three.)

Options:

A.

Pair work

B.

Iteration planning

C.

Communities of Practice

D.

Inspect and Adapt

E.

Hackathons

F.

Backlogrefinement

Questions # 2:

How is team performance calculated in SAFe?

Options:

A.

The ratio of tasks planned to tasks completed

B.

The ratio of business value achieved to business value planned for the PI

C.

The ratio of Story points completed to Story points planned in the PI

D.

Team member utilization as a percentage of total capacity

Questions # 3:

Which two statements are true about a Feature? (Choose two.)

Options:

A.

It is developed within a single Agile Team

B.

It is fully completed by a single Agile Release Train within one PI

C.

It is prioritized using weighted shortest job first

D.

It has one Capability as a parent

Questions # 4:

When should centralized decision-making be used?

Options:

A.

When there are significant economies of scale

B.

When decisions are short-term in duration

C.

When decisions need specific local context

D.

When making frequent decisions

Questions # 5:

What is one requirement for achieving Continuous Deployment?

Options:

A.

Decouple deployment from release

B.

Couple development cadence and deployment cadence

C.

Create all Features using behavior-driven development

D.

Automate all unit-tests

Questions # 6:

A Scrum Master is frustrated that her team finds no value during Iteration retrospectives, and the team has asked that she cancel all future ones. Which two specific anti-patterns are most likely present within the team's retrospectives? (Choose two.)

Options:

A.

The team does not feel valued by the Enterprise

B.

The team identifies improvements but is not allowed to address them

C.

The team does not identify and commit to improvement items for how they do their work

D.

The team does not inspect the Program Increment and revise the product backlog

Questions # 7:

What should be the first step a team should take to feed potential problems into the Problem Solving workshop?

Options:

A.

Identify enablers needed to build out the Architectural Runway

B.

Conduct a short team retrospective

C.

Review feedback from the System Demo

D.

Analyze quantitative & qualitative metrics

Questions # 8:

How is average lead time measured in a Kanban system?

Options:

A.

By taking the average velocity over the last three iterations

B.

Measure the vertical distance between arrival and departure lines on a cumulative flow diagram

C.

Measure the horizontal distance between arrival and departure lines on a cumulative flow diagram

D.

Measure the lead time for at least three items and calculate the statistical mean of the items

Questions # 9:

Inspect and Adapt events occur at which two SAFe levels? (Choose two.)

Options:

A.

Portfolio Level

B.

Essential Level

C.

Team Level

D.

Value Stream Level

Questions # 10:

What are two characteristics of teams that fear conflict? (Choose two.)

Options:

A.

They avoid pair work

B.

They ignore controversial topics that are critical to team success

C.

They fail to tap into all the opinions and perspectives of team members

D.

They have longer meetings

E.

They do not focus on results