An architect has been tasked with designing a greenfield hosting platform.
As part of a workshop, it is identified that the new solution must support the following:
Provide a centralized way to enforce virtual network security policy
Provide network security for both virtual machines and containerized applications
Deny network access between all workloads by default
Linked services should be connected to the same virtual port groups by default
Support for the security teams network monitoring solution
Which elements should the architect include in the design to meet the identified requirements?
An architect is responsible for the lifecycle management design for a brownfield vSphere-based solution.
The following information has been provided during initial meetings around the new solution:
Existing heterogeneous server hardware will be used to provide the hosting platform.
The available hardware is:
-- 10 servers that contain 2 x 20-Core Intel Xeon processors and 512 GB RAM from Vendor A
-- 10 servers that contain 2 x 24-Core Intel Xeon processors and 768 GB RAM from Vendor A
-- 20 servers that contain 2 x 16-Core AMD EPYC processors and 512 GB RAM from Vendor B
-- 10 servers that contain 1 x 24-Core AMD EPYC processors and 256 GB RAM from Vendor C
All of the hardware is currently listed on the VMware Hardware Compatibility List (HCL).
All existing server hardware has 36 months vendor support remaining.
The requirements from the customer are:
REQ001 - The solution must support the hosting of 5,000 workloads across two physical sites.
REQ002 - The solution should minimize the number of clusters.
REQ003 - The solution must ensure that there is no impact to service when completing upgrades.
Given the resource requirements needed for the solution, the architect has calculated that all of the existing servers will be required to provide sufficient resources for the new environment. The Intel-based servers will be deployed to the primary site and the AMD-based servers will be
deployed to the secondary site.
Which four additional design decisions should the architect make to ensure all requirements can be met? (Choose four.)
A company will be replacing the external storage array that is currently providing storage to the vSphere environment. The architect must design a storage architecture for existing and future workloads. Company policy required storage separation of workloads by departments.
Which design decision should the architect make to satisfy the requirement and scale for additional departments?
An architect is responsible for the following customer considerations in a hardware refresh:
Capacity planning will ensure that the environment does not exceed 70% of peak-average utilization on deployment.
CPU purchases will favor clock speed and last level cache over cores per socket.
Additional ESXi hosts will be added to the cluster when CPU or memory utilization exceeds 70% for 3 consecutive business days.
Path Selection policy will be set to round robin and set to switch paths with every SCSI command.
vCPU to pCPU ratio may not exceed 5:1.
What are three considerations when designing for performance? (Choose three.)
An architect is designing the access management component of a vSphere-based solution. During a requirements gathering workshop, the customer states that the architecture must use a centralized user authentication solution.
The architect decides that an Open Lightweight Directory Access Protocol (OpenLDAP) solution would meet the requirement. The security team intervenes and requires that the solution use the corporate Active Directory Domain Services solution.
At which point did the architect's design become constrained?
An architect is designing an upgrade to an existing vSphere environment. The project has been created to provide options for enabling growth and scalability, without increasing the data center footprint. The CIO has also tasked the architect with updating data protection operations, from the current agent-based backup approach.
During a workshop with key stakeholders, the following information has been noted:
The existing vSphere environment uses an external fibre attached storage array for the vSphere environment
The storage array is connected via 4 Gbps fibre cards host bus adaptors (HBAs)
The storage array does not support VMware Storage APIs—Data Protection (VADP)
The architecture must support scaling virtual machines CPU, memory, and storage
The environment will grow by an additional 20% virtual machines year over year
Only two additional racks of equipment can be provisioned
Which design choice will meet these requirements?
An architect is tasked with designing a new vSphere environment for a customer. The new environment must:
Be standardized, repeatable, and consistent
Contain the same common heterogenous components that run from commercial hardware across an on-premises, edge, and broad hybrid cloud eco-system
Provide intrinsic and intelligent security in every component from the hypervisor to the storage, networking, and management layers
Which VMware solution will satisfy these requirements?
An architect is responsible for designing a new vSphere-based solution to meet the following customer requirements:
The solution must support component-level redundancy.
The solution must support physical segregation of management and workload traffic.
Any traffic from virtual infrastructure-level operations (such as migrations of workloads between hosts within a cluster) must not impact any workload.
The solution should react to any substantial impact of physical network traffic to ensure workload traffic is unaffected.
In response to this requirement, the architect makes the following logical design decisions:
The solution will separate vSphere management traffic from all other network traffic.
The solution will ensure that all replication and vMotion traffic will be separated from all other traffic.
The solution will separate workload traffic from all other network traffic.
The customer has a hardware standard for physical VMware ESXi host servers that includes 6 x 10 GbE network.
Which three physical design decisions should the architect make to meet the requirements? (Choose three.)
During a workshop for a design project, the following information is shared:
Develop and maintain strong relationships with key stakeholders and partners to promote collaboration.
Maintain high standards of quality and professionalism in all aspects of the project.
Build a strong foundation for future projects, including cloud infrastructures.
Ensure project timelines and milestones are met by effectively managing resources and priorities.
Which of these would be classified as a business outcome of the project?
An architect is designing a solution for a customer to meet the following business objectives:
Pass compliance audits
Reuse compute hardware
Grow by 10% per year
Move to a subscription-based consumption model
Which business objective translates as a conceptual model constraint?