Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the API ICP Programs API-580 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam API-580 Premium Access

View all detail and faqs for the API-580 exam


723 Students Passed

97% Average Score

94% Same Questions
Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
Questions # 11:

Corrosion, cracking, and mechanical are all examples of what?

Options:

A.

Leaks

B.

Failure modes

C.

Failure mechanisms

D.

Damage mechanisms

Questions # 12:

An RBI assessment of new equipment or a new project may:

Options:

A.

not be useful because there is no inspection history.

B.

be needed in order to define the risk criteria to be used in service.

C.

be conducted only after 1000 hours of operation to establish operating and inspection data.

D.

yield useful information on potential future risks.

Questions # 13:

In RBI, operating conditions that should be considered include:

Options:

A.

emergency shutdown and start-up

B.

only those that could cause significant leaks

C.

idle or out of service time

D.

upset conditions

E.

all possible operating conditions, even if unlikely

F.

those considered an “act of God.”

Questions # 14:

When equipment has deteriorated to such an extent that the risk of failure cannot be managed and held to an acceptable level, often the only way to mitigate risk is to:

Options:

A.

repair/replace the equipment.

B.

perform a fitness-for-service analysis.

C.

shorten the inspection interval.

D.

rerate the equipment.

Questions # 15:

Who shall be responsible for assessing the types of damage mechanisms and their applicability and severity to the equipment?

Options:

A.

The risk analyst leading the team

B.

The RBI assessment team

C.

A corrosion specialist

D.

The inspector or inspection specialist

Questions # 16:

Risk assessment is defined as the:

Options:

A.

process to find, list, and characterize elements of risk.

B.

systematic use of information to estimate risk and conduct risk evaluation.

C.

coordinated activities to direct and control risk in an organization.

D.

process used to assign values to the probability and consequence of risk.

Questions # 17:

Which of the following is a step in estimating the consequences of releasing a hazardous material into the surrounding environment?

Options:

A.

Estimating the release rate

B.

Identifying the most likely failure mode

C.

Determining the deterioration susceptibility and rate

D.

Identifying active and credible damage mechanisms

Questions # 18:

The POF analysis shall address what type of damage mechanisms to which the equipment being reviewed can be susceptible?

Options:

A.

All corrosion and cracking damage mechanisms

B.

All damage mechanisms in API RP 571

C.

All potential damage mechanisms

D.

All credible damage mechanisms

Questions # 19:

As indicated in API RP 580, one essential element of an RBI program includes:

Options:

A.

avoidance of catastrophic loss and fatalities.

B.

documented method of COF determination.

C.

consideration of all possible damage mechanisms.

D.

the reduction of risk associated with loss of containment.

Questions # 20:

Risk evaluation is defined as the process used to:

Options:

A.

find, list, and characterize elements of risk.

B.

select and implement measures to modify risk.

C.

compare estimated risk against given risk criteria.

D.

assign values to the probability and consequence of risk.

Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.