Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the APICS CPIM CPIM-8.0 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam CPIM-8.0 Premium Access

View all detail and faqs for the CPIM-8.0 exam


896 Students Passed

84% Average Score

97% Same Questions
Viewing page 3 out of 12 pages
Viewing questions 31-45 out of questions
Questions # 31:

One of the benefits of Integrating a poka-yoke into the production process is that it can be used to:

Options:

A.

facilitate mixed-model scheduling.

B.

prevent defects.

C.

Improve machine utilization.

D.

enable one-piece flow.

Questions # 32:

When designing a production cell, which of the following items would be the most important consideration?

Options:

A.

Theunit per hour requirement for the production cell to meet the sales forecast

B.

Theflow of materials into the cell and sequencing of operations to minimize total cycle time

C.

Theoutput rate for the first operation and move time after the last workstation

D.

Thetakt time requirement for each operator to meet the monthly production goals of theplant

Questions # 33:

Which of the following statements is true about the meantime between failures (MTBF) measure?

Options:

A.

It is used for non-repairable products.

B.

An increase in MTBF is proportional to anincrease inquality.

C.

It is a useful measure of reliability.

D.

It is the same as operating life or service life.

Questions # 34:

Reducing distribution network inventory days of supply will have which of the following Impacts?

Options:

A.

Increase turnovers and increase cash-to-cash cycle time.

B.

Increase turnovers and reduce cash-to-cash cycle time.

C.

Decrease turnovers and reduce cash-to-cash cycle time.

D.

Decrease turnovers and increase cash-to-cash cycle time.

Questions # 35:

Long lead-time items with stable demand would best be supported by a supply chain:

Options:

A.

using a pull system.

B.

linked through an enterprise resources planning (ERP) system.

C.

designed to be responsive.

D.

positioning inventory close to the consumer.

Questions # 36:

The question below is based on the following information:

Beginning inventory = 43Week 1Week 2Week 3

Forecast202020

Customer orders221710

Projected on-hand

Master production schedule (MPS)80

Available-to-promise (ATP)

What is the largest customer order that could be accepted for delivery at the end of week 3 without making changes to the master production schedule (MPS)?

Options:

A.

74

B.

63

C.

61

D.

31

Questions # 37:

When starting an external benchmarking study, a firm must first:

Options:

A.

determine the metrics which will be measured and compared.

B.

identify the target firms with which to benchmark against.

C.

understand its own processes and document performance.

D.

determine its areas of weakness versus the competition's.

Questions # 38:

An example of an assignable cause of variation in process performance is:

Options:

A.

power fluctuation during machine operation.

B.

machine vibration during operation.

C.

incorrect setup of a machine by the operator.

D.

changes in temperature in the machine shop.

Questions # 39:

An advantage of applying ABC classification to a firm's replenishment items is that:

Options:

A.

it distinguishes independent demand from dependent demand.

B.

it allows planners to focus on critical products.

C.

it provides better order quantities than the economic order quantity (EOQ).

D.

it allows the firm to utilize time-phased order point (TPOP).

Questions # 40:

A life cycle assessment (LCA) would be used to determine:

Options:

A.

the length of a long-term agreement.

B.

how an Item should be scheduled.

C.

environmental aspects and impacts.

D.

If risk pooling would reduce inventory investment.

Questions # 41:

Typically, rough-cut capacity planning (RCCP) in a job shop environment would review which of the following work centers to determine the ability to execute the plan?

Options:

A.

Critical work centers only

B.

Gateway work centers only

C.

Final assembly work centers only

D.

All work centers

Questions # 42:

A work center has 3 machines that are all run at the same time with a single worker. The work center has an efficiency of 75% and a utilization of 100%. What is the work center's capacity in standard hours for an 8-hour shift?

Options:

A.

6 hours

B.

8 hours

C.

18 hours

D.

24 hours

Questions # 43:

The time spent In queue by a specific manufacturing job is determined by which of the following factors related to the order?

Options:

A.

Lot size

B.

Priority

C.

Setup time

D.

Run time

Questions # 44:

Which of the following strategies is most appropriate for a business unit with a low relative market share in a high-growth market?

Options:

A.

Using excess cash generated to fund other business units

B.

Investing in the acquisition of competitors

C.

Investing in projects to maintain market share

D.

Designing product improvements to protect market share

Questions # 45:

A company's primary performance objective Is flexibility. Which of the following measurements is most important?

Options:

A.

Labor productivity

B.

Schedule adherence

C.

Machine changeover time

D.

Cycle time

Viewing page 3 out of 12 pages
Viewing questions 31-45 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.