Questions # 21:

Which of the following statements is true regarding a failure mode and effect analysis (FMEA)?

Options:

A.

A FMEA is a pictorial representation of the reliability interdependency of components.

B.

A FMEA should not get updated throughout the life cycle of the product.

C.

The advantage of a FMEA is to communicate the risk with different stakeholders.

D.

The first step in the development of an FMEA is to calculate the Risk Priority Number (RPN).

Questions # 22:

A company's quality policy should be developed by the

Options:

A.

executive level of management

B.

manager of quality

C.

most productive process improvement team

D.

quality engineering department

Questions # 23:

A graph of a data set, composed of a series of rectangles, each proportional in width to the range of values in a class and proportional in height to the number of items or fraction of items falling in these classes, is called which of the following?

Options:

A.

Histogram.

B.

Raw data.

C.

Ogive.

D.

Venn diagram.

Questions # 24:

A material review board (MRB) gets its authority to act from which of the following functions?

Options:

A.

Executive management

B.

Purchasing

C.

Engineering

D.

National or international standards

Questions # 25:

80° o of weekly inspection non-conforming reports presented to the material review board (MRB) at Marathon Manufacturing Co. end up not being dispositioned for corrective action. Project management developed a risk management plan which included a standard repair manual (SRM) to help mitigate these issues. Only conditions that exceed SRM requirements or specifications will now be forwarded for MRB review. A week after releasing the SRM. the quality engineering team decided to generate and distribute weekly alert reports of non-conformities that exceed SRM requirements or specifications to all inspectors. They also instructed all employees involved in the creation of those discrepancies be re-trained.

Which of the following processes may be considered a risk treatment?

Options:

A.

Generating a weekly report of non-conformities that exceed SRM requirement and specifications

B.

Distributing weekly alert report of non-conformities to all inspectors

C.

Instructing that all employees involved creating those discrepancies be re-trained

D.

Reducing throughput at Marathon Manufacturing Co.

Questions # 26:

The best reason to record and distribute meeting minutes is to

Options:

A.

capture any decisions made

B.

track the attendance of participants

C.

create an agenda for the next meeting

D.

create a record of the rime, place, and duration of the meeting

Questions # 27:

Question # 27

M in tills drawing, the symbol is being used to indicate the

H Calculator

Options:

A.

minimum material condition

B.

minimum measured condition

C.

maximum material condition

D.

maximum measured condition

Questions # 28:

Which of the following factors has the most influence on the success of quality initiatives?

Options:

A.

Buy-in at all levels of management

B.

Leadership by quality assurance staff

C.

Cooperation from front-line workers

D.

Deployment of statistical process control

Questions # 29:

Adjusting machine settings to reduce the effect of ambient temperature changes on the seal strength of a paper package is an example of

Options:

A.

robust design

B.

analysis of variance

C.

statistical process control

D.

process capability

Questions # 30:

Which of the following symbols represents process performance index?

Options:

A.

CP

B.

Cpk

C.

ppk

D.

P

Viewing page 3 out of 6 pages