Questions # 31:

Which of the following types of testing is conducted to test the interfaces and interactions between source code modules?

Options:

A.

system

B.

integration

C.

functional

D.

component

Questions # 32:

The use of a rigorous mathematical proof to analyze the algorithm of a software component is a feature of

Options:

A.

boundary value analysis

B.

functional decomposition

C.

dynamic analysis

D.

formal methods

Questions # 33:

Which of the following steps comes first during release planning for waterfall-type projects?

Options:

A.

Define the scope of the software being developed.

B.

Determine which problems will be corrected in the next release.

C.

Select the set of requirements that will be included in the release.

D.

Confirm the implemented software meets the specified requirements.

Questions # 34:

While conducting a unit test, a developer would use a

Options:

A.

black-box test case

B.

driver or stub

C.

top-down or bottom-up design

D.

scenario-based test case

Questions # 35:

A company uses a feature rating system with the following values.

1 = Completely dissatisfied

2 = Somewhat dissatisfied

3 = Neither satisfied nor dissatisfied

4 = Somewhat satisfied

5 = Completely satisfied

This rating system is based on what type of measurement scale?

Options:

A.

Nominal

B.

Ordinal

C.

Interval

D.

Ratio

Questions # 36:

A sprint started with 354 requirements. As the sprint progressed, 14 requirements were introduced, 6 requirements were removed, and 28 requirements were changed. What was the requirements volatility for this sprint?

Options:

A.

8.8%

B.

11.9%

C.

13.5%

D.

15.7%

Questions # 37:

Which of the following scenarios warrants the adoption of software configuration management tools?

Options:

A.

A project with short timelines to completion

B.

A simple project with few files and little complexity

C.

A complex project with multiple modifications and frequent change requests

D.

A project without security requirements or specified control over files and changes

Questions # 38:

Which of the following activities generally requires the most effort after the release of a software system?

Options:

A.

Customer acceptance

B.

Performing maintenance

C.

Revising documentation

D.

Training the users

Questions # 39:

Each software development process should have a clearly defined set of inputs, activities, outputs, and

Options:

A.

stimuli criteria

B.

entry exit criteria

C.

go no-go criteria

D.

cost estimates

Questions # 40:

Which of the following statements best describes the purpose of a matrix diagram?

Options:

A.

It allows a team to rank priorities and then quickly come to a consensus.

B.

It shows which problems offer the greatest potential for improvement.

C.

It allows a systematic comparison between sets of information.

D.

It shows the size of gaps between current and ideal performance areas.