Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the BCS ISTQB Certified Tester CTFL4 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam CTFL4 Premium Access

View all detail and faqs for the CTFL4 exam


643 Students Passed

86% Average Score

90% Same Questions
Viewing page 4 out of 6 pages
Viewing questions 31-40 out of questions
Questions # 31:

The four test levels used in ISTQB syllabus are:

1. Component (unit) testing

2. Integration testing

3. System testing

4. Acceptance testing

An organization wants to do away with integration testing but otherwise follow V-model. Which of the following statements is correct?

Options:

A.

It is allowed as organizations can decide on men test levels to do depending on the context of the system under test

B.

It is allowed because integration testing is not an important test level arc! can be dispensed with.

C.

It is not allowed because integration testing is a very important test level and ignoring i: means definite poor product quality

D.

It is not allowed as organizations can't change the test levels as these are chosen on the basis of the SDLC (software development life cycle) model

Questions # 32:

The following 4 equivalence classes are given:

Question # 32

Which of the following alternatives includes correct test values for x. based on equivalence partitioning?

Options:

A.

-100; 100:1000; 1001

B.

-500; 0; 100; 1000

C.

-99; 99:101; 1001

D.

-1000; -100; 100; 1000

Questions # 33:

A requirement specifies that a certain identifier (ID) must be between 5 and 10 characters long, must contain only alphanumenc characters, and its first character must be a letter As a tester, you want to apply one-dimensional equivalence partitioning to test this ID. This means that you have to apply equivalence partitioning individually: to the length of the ID, the type of characters contained within the ID, and the type of the first character of the ID. What is the number of partitions to cover?

Options:

A.

7.

B.

6.

C.

5.

D.

3.

Questions # 34:

During which main group of test activity are the following tasks performed?

•Checking test results and logs against specified coverage criteria.

•Assessing the level of component or system quality based on test results and logs.

•Determining whether more tests are needed.

Select the correct answer:

Options:

A.

Test planning.

B.

Test analysis.

C.

Test design.

D.

Test monitoring and control.

Questions # 35:

Which of the following lists factors That contribute to PROJECT risks?

Options:

A.

skill and staff shortages; problems in defining the right requirements, contractual issues.

B.

skill and staff shortages; software does not perform its intended functions; problems in defining the right requirements.

C.

problems in defining the right requirements; contractual issues; poor software quality characteristics.

D.

poor software quality characteristics; software does not perform its intended functions.

Questions # 36:

Which ONE of the following options corresponds to an activity in the testing process in which testable features are identified?

Options:

A.

Test design

B.

Test analysis

C.

Test implementation

D.

Test execution

Questions # 37:

The following decision table is used to assist a doctor in determining the drug therapy to prescribe for a patient (aged 6 to 65 years) diagnosed with acute sinusitis. The table consists of three Boolean conditions and six actions

Question # 37

Based only on the given information, which of the following statements is TRUE?

Options:

A.

Column 7 represents an impossible situation and thus can be deleted

B.

Columns 1 and 3 can be merged into a single column

C.

Columns 2, 4, 6 and 8 can be merged into a single column

D.

Columns 5 and 7 can be merged into a single column

Questions # 38:

Which of the following statements refers to a good testing practice that applies to all software development lifecycles?

Options:

A.

Each test level should have its own specific test objectives that should be consistent with the software development lifecycle phase or type of activities it addresses.

B.

Test analysis and design for any test levels should begin as soon as coding is complete, and all system components are available for testing

C.

The most efficient and effective method of conveying information to and within a development team is face-to-face conversation.

D.

All the tests should be automated and run as part of the continuous integration process with every software change

Questions # 39:

Which of the following applications will be the MOST suitable for testing by Use Cases

Options:

A.

Accuracy and usability of a new Navigation system compared with previous system

B.

A billing system used to calculate monthly charge based or large number of subscribers parameters

C.

The ability of an Anti virus package to detect and quarantine a new threat

D.

Suitability and performance of a Multi media (audio video based) system to a new operating system

Questions # 40:

After being in operation for many years, a document management system must be decommissioned as it has reached its end of life. This system will not be replaced by any other new system. A legal obligation provides that all documents within the system must be kept for at least 20 years in a state archive. Which of the following statements about maintenance testing for decommissioning of this system is TRUE?

Options:

A.

No maintenance testing is required as this system will not be replaced.

B.

Data migration testing is required as part of maintenance testing

C.

Confirmation testing is required as part of maintenance testing.

D.

Regression testing is required as part of maintenance testing

Viewing page 4 out of 6 pages
Viewing questions 31-40 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.