Spring Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the BICSI Cabling Installation INST1-V8 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam INST1-V8 Premium Access

View all detail and faqs for the INST1-V8 exam


711 Students Passed

85% Average Score

91% Same Questions
Viewing page 2 out of 4 pages
Viewing questions 11-20 out of questions
Questions # 11:

What type of coaxial cable is used for video backbone distribution?

Options:

A.

Series 6

B.

Series 11

C.

RG 59

D.

RG 58

Questions # 12:

Which of the following PPE items MUST be worn at all times when you are working with or handling OF?

Options:

A.

Fall Protection

B.

Eye Protection

C.

Hearing Protection

D.

Breathing Protection

Questions # 13:

Which of the following is the first step of the emergency rescue process?

Options:

A.

Survey the scene

B.

Contact 911

C.

Notify someone

D.

Secure the area

Questions # 14:

Which of the following steps should be performed first when an installer is pulling optical fiber cable?

Options:

A.

Install and secure innerduct

B.

Ensure the cable has been tested and accepted

C.

Label cables

D.

Attach pull rope

Questions # 15:

Which of the following is the primary benefit of using wall-mounted racks and cabinets in place of traditional equipment racks?

Options:

A.

Provides equipment with a higher level of protection

B.

Allows for the equipment to be easily rearranged

C.

Optimizes airflow within the equipment room

D.

Takes up less space within the equipment room

Questions # 16:

Which of the following interconnects the PBB to the SBB?

Options:

A.

TBB

B.

BBC

C.

RBB

D.

TEBC

Questions # 17:

Which of the following types of construction protects the optical fiber by supporting each strand of glass with a buffer coating extruded over the base optical fiber's 250 um acrylate coating?

Options:

A.

Single stranded

B.

Loose tube

C.

Tight buffered

D.

Ribbon

Questions # 18:

A grey backboard should be used to identify _____ backbone cable?

Options:

A.

Second-level

B.

Intrabuilding

C.

First-level

Questions # 19:

Which of the following must be measured before the length of a coaxial cable can be calculated?

Options:

A.

Propagation delay

B.

Insertion loss

C.

DC loop resistance

D.

Delay skew

Questions # 20:

What is the required physical topology for a SCS?

Options:

A.

Star

B.

Bus

C.

Ring

D.

Tree

Viewing page 2 out of 4 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.