Questions # 1:

Cost classification, data organization, and specifications use which written formats?

Options:

A.

OmniClass and UniFormat

B.

UniFormat and MasterFormat

C.

OmniClass and MasterFormat

D.

SectionFormat® and MasterFormat

Questions # 2:

What does the Integrated Project Delivery (IPD) process involve?

Options:

A.

A collaborative, integrated, and productive team composed of key project participants

B.

Traditional delivery methods and team relationships for improving project performance by understanding the qualifications and attributes of team members

C.

Responsibility silos for greater efficiencies, leading to project success

D.

Segregat knowledge gathered as needed with paper-based communications to team members

Questions # 3:

The names of the project, owner, architect/engineer and consultants, and the general project data such as a location map are normally included in which of the following?

Options:

A.

Sheet index

B.

Cover sheet

C.

General notes

D.

Building code summary

Questions # 4:

Peer reviews or internal reviews of completed documents are examples of what?

Options:

A.

Quality control

B.

Commissioning

C.

Quality assurance

D.

Construction administration

Questions # 5:

Lump sum, unit price, and cost-plus-fee are examples of what?

Options:

A.

Delivery method

B.

Bonding system

C.

Basis of payment

D.

Cost estimate

Questions # 6:

Procedural requirements for alternates, project meetings, and submittals belong where?

Options:

A.

Divisions 02-49

B.

The general conditions

C.

The supplementary conditions

D.

Division 01

Questions # 7:

What is a primary disadvantage in using the design-bid-build method?

Options:

A.

It attracts too many bidders

B.

All of the bids may exceed the owner's budget

C.

It requires a higher level of bid document quality

D.

It reduces the owner's control over the project during the construction phase

Questions # 8:

Which of the following ensure that all systems work together effectively to meet the overall project performance goals?

Options:

A.

Total project commissioning

B.

Inspection by architect

C.

Safety testing

D.

Field testing

Questions # 9:

When a public works project utilizes design-bid-build, which option would NOT minimize the risk of bid shopping?

Options:

A.

The architect/engineer/owner team can consider bid listing and bid depository provisions.

B.

Require bidders to provide a list of their intended subcontractors along with their bid.

C.

The subcontractor can withhold their prices from the bidder until the final moments before the deadline.

D.

The bidder can ask the subcontractor to reevaluate their prices to find a lower price after the subcontractor has submitted their price.

Questions # 10:

Which of the following is a format that standardizes the way text is arranged in specification pages so that it is best suited for easy reading and rapid reference?

Options:

A.

SectionFormat®

B.

PageFormat

C.

MasterFormat®

D.

UniFormat®