Questions # 11:

Which meeting is held for the purposes of introducing the design and construction teams, establishing the ground rules for communication, and explaining the administrative process?

Options:

A.

Mobilization meeting

B.

Preconstruction meeting

C.

Prebid meeting

D.

Coordination meeting

Questions # 12:

Who is responsible for planning, maintaining, and supervising construction safety measures and programs?

Options:

A.

Architect/engineer

B.

OSHA

C.

Owner's inspector

D.

Contractor

Questions # 13:

During the bid period, what does the architect issue if it is necessary to modify the procurement documents?

Options:

A.

Addenda

B.

Construction change directives

C.

Change order

D.

RFI response

Questions # 14:

When is the owner entitled to stop the work?

Options:

A.

If the architect/engineer fails to represent owner properly

B.

If the contractor fails to correct work that is not compliant with the contract documents

C.

If the contractor is presumed to be bankrupt

D.

If there is a safety problem on the site

Questions # 15:

What is Leadership in Energy and Environmental Design® (LEED®)?

Options:

A.

A set of sustainable standards with measurable recognized categories for a project

B.

A formula for determining a sustainable classification

C.

A system of prioritizing sustainable projects

D.

Standardized structure for organizing sustainable information

Questions # 16:

What can value analysis be used for?

Options:

A.

To provide the owner with the lowest construction cost.

B.

To enhance project value or reduce initial or long-term cost.

C.

A phase for future work to allow higher quality items up front.

D.

To change the perceived value by owner and stakeholder.

Questions # 17:

What does Divisions 02-49 of the construction project manual address?

Options:

A.

Procurement instructions

B.

Distinct work results areas

C.

Temporary facilities and controls

D.

Life cycle activities

Questions # 18:

How do private bidding practices compare or contrast with public bidding practices?

Options:

A.

A private owner may waive any informality in the bidding, except for the performance bond.

B.

Private bids may be opened in private, but the results must be published in a reasonable time.

C.

The laws and regulations for private bidding are the same as for public bidding.

D.

The private owner may award a contract to a responsive and responsible bidder other than the lowest.

Questions # 19:

Where should the contractor continuously document changes made in the field due to actual conditions encountered, such as foundation pier depth and the location of concealed internal utilities?

Options:

A.

Conformed set

B.

Record set

C.

Change order log

D.

Request for information documents

Questions # 20:

Within the context of the construction industry, what does BIM stand for?

Options:

A.

Building Information Modeling

B.

Business Information Manual

C.

Building Interior Maintenance

D.

Building Inspection Manual

Viewing page 2 out of 4 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.