Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the DELL EMC Converged Infrastructure D-VXR-DS-00 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam D-VXR-DS-00 Premium Access

View all detail and faqs for the D-VXR-DS-00 exam


749 Students Passed

87% Average Score

93% Same Questions
Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
Questions # 11:

Which protocol must be configured on the ToR switch to allow automated discovery of a VxRail node?

Options:

A.

Loudmouth

B.

VxLAN

C.

IPv4 multicast

D.

LLDP

E.

IPv6 multicast

Questions # 12:

A customer has an existing VxRail vSAN OSA cluster consisting of 5 x E660F nodes.

Which two node types can be added to that cluster? (Choose two.)

Options:

A.

E665F

B.

P670F

C.

E660N

D.

E660

Questions # 13:

What is a benefit of using the VxRail Sizing Tool to size a VDI environment for 1000 users with limited information?

Options:

A.

Guarantees the recommended model performance to support the VDI solution.

B.

Simplifies the deployment of the recommended model to install the VDI software.

C.

Validates the recommended model accommodates the VDI solution.

D.

Automatically configures therecommendedmodel for the VDI solution

Questions # 14:

What are the minimum network bandwidths required for vSAN?

Options:

A.

10 GbE for OSA, 25 GbE for ESA

B.

1 GbE for OSE, 10 GbE for ESA

C.

10 GbE for OSA, 10 GbE for ESA

Questions # 15:

An IT Architect is using the VxRail Sizing Tool. The architect started a new project, provided the project type, and selected the solution type.

What is the next step that the architect needs to undertake to proceed with the process?

Options:

A.

Save the project

B.

Export the result to a report

C.

Size the configuration

D.

Enter workload requirements

Questions # 16:

What is a result of using the VxRail Sizing Tool to size a new cluster?

Options:

A.

The lowest price solution is the recommended configuration.

B.

The highest price solution is the recommended configuration.

C.

Single workloads are only considered when sizing the new cluster.

Questions # 17:

What is the minimum number of nodes required for erasure coding with FTT=2 in a vSAN ESA cluster?

Options:

A.

5 nodes

B.

4 nodes

C.

3 nodes

D.

6 nodes

Questions # 18:

An architect must deploy the Live Optics tool to gather information from an existing customer environment.

What is the correct way to begin this process?

Options:

A.

Sign up on the Live Optics website and connect to the public IP address of your VMware vCenter Server

B.

Sign up on the Live Optics website, download the collector, and install it into the VMware vCenter Server

C.

Sign up on the Live Optics website, download the collector, and deploy it on a suitable workstation or server

Questions # 19:

What are two reasons to provide minimum ceiling clearance above a VxRail rack? (Choose two.)

Options:

A.

Room for forklift

B.

Sprinkler system

C.

Service access

D.

Anti-static protection

E.

Airflow management

Questions # 20:

A customer is planning to expand an existing VxRail vSAN cluster. Their current rack is full, so the cluster has to expand to an additional rack. Due to networking requirements, each rack is a Layer 2 boundary, so the new nodes require new management, vSAN, and vMotion subnets.

When designing the solution, what are two considerations that the architect should consider? (Choose two.)

Options:

A.

Automatic node discovery is not supported; manual discovery must be used.

B.

VxRail Manager must remain in the first rack.

C.

vSAN ESA is not supported. Only vSAN OSA is supported.

D.

VMware Cloud Foundation is not supported.

Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.