Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the HP ACMX HPE7-V01 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam HPE7-V01 Premium Access

View all detail and faqs for the HPE7-V01 exam


0 Students Passed

0% Average Score

0% Same Questions
Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
Questions # 11:

Your customer has a combination of HPE and non-HPE equipment.

Which is the correct functionality available in Aruba Fabric Composer for this customer’s environment?

Options:

A.

Management and monitoring of HPE Alletra Storage MP B10000 arrays.

B.

Configuration of SAN zoning on ArubaOS-CX 8400 switches.

C.

Management of Pensando cards in the servers.

D.

VLAN visibility of VMware on non-HPE servers.

Questions # 12:

Your customer has requested a solution with HPE Alletra Storage MP B10000 that needs four SFP28 ports per node, for iSCSI connectivity.

Question # 12

A junior architect has prepared a BOM for the solution.

What needs to be changed in the BOM to meet the requirement?

Options:

A.

Remove the 52564A HBAs and add Q2P64B XCVRs to the BOM.

B.

Add two 52564A HBAs to the BOM.

C.

Add four Q2P64B XCVRs to the BOM.

D.

Replace the 52564A HBAs with R7C82A HBAs in the BOM.

Questions # 13:

Which statement about HPE SimpliVity is true?

Options:

A.

HPE SimpliVity 380 Gen11 cluster with compute nodes requires the same CPU in all nodes.

B.

Mixing AMD and Intel chassis in the same federation is fully supported.

C.

A single AMD-based HPE SimpliVity node can support up to 4 non-HPE SimpliVity servers.

D.

A single Intel-based HPE SimpliVity node can support up to 8 non-HPE SimpliVity servers.

Questions # 14:

You presented a solution to your customer that will replace their legacy HPE BladeSystem.

The new solution is based on the HPE Synergy platform and consists of the following components:

    5 HPE Synergy 12000 frames

    2 HPE Virtual Connect SE 100Gb F32 Module for Synergy

    8 HPE Synergy 50Gb Interconnect Link Module

    60 HPE Synergy 480 Gen11

Which statement describes the business and financial benefits for this new solution on the customer?

Options:

A.

HPE Synergy supports master/satellite approach that requires less HPE Virtual Connect modules, and so will be more economical.

B.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more interconnect modules which provides better scalability and expansion possibilities.

C.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more expansion slots in the form of mezzanine cards.

D.

HPE Synergy needs more HPE Virtual Connect modules because of the increased bandwidth for Gen11 compute nodes.

Questions # 15:

You are validating the hardware architecture for an AI solution.

Your customer has requested that you focus on possible upgrades for their HPE ProLiant Compute DL384 Gen12 server.

Which of the following statements is correct?

Options:

A.

The GPU performance can be increased by adding more Nvidia GB200 accelerators.

B.

The Superchips on the server include a fixed amount for the memory configuration.

C.

The amount of supported EDSFF drives depends on the selected RAID controller.

D.

The 400Gb NICs can be added if liquid cooling is used with the chassis.

Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.