Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Huawei HCIP-Storage H13-624 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam H13-624 Premium Access

View all detail and faqs for the H13-624 exam


756 Students Passed

91% Average Score

91% Same Questions
Viewing page 4 out of 15 pages
Viewing questions 46-60 out of questions
Questions # 46:

When deploying OceanStor 9000 through the deployment tool, the IP entered in the "IP address range" in the "DHCP configuration" area

The address is only used temporarily during the deployment process. After the deployment is successful, the IP address of each node is modified to the IP address planned in the configuration file

Options:

A.

True

B.

mistake

Questions # 47:

When planning the IP address of the back-end storage network of the OceanStor 9000 IB network deployment plan, you need to plan for each node

2 back-end storage IP addresses and 1 temporary IP address

Options:

A.

True

B.

mistake

Questions # 48:

C72 is "a large-capacity archive node device with a height of 4U, but it can also be fully equipped with 272 SAS disks to accommodate one

Some scenarios with relatively high performance and capacity requirements.

Options:

A.

True

B.

False

Questions # 49:

When the amount of backup data is large, it is recommended to use an all-in-one deployment plan instead of a separate one.

Options:

A.

True

B.

False

Questions # 50:

The data format before and after the backup is the same. The backup data can be directly used to restore production data to ensure the continuity of business read and write.

Options:

A.

True

B.

False

Questions # 51:

In the design of backup solutions, the following things need to be considered: (multiple choices)

Options:

A.

Bandwidth and network design,

B.

Backup system migration design

C.

Data and application recovery strategy design

D.

Capacity and storage strategy design

Questions # 52:

Before designing a backup plan, you need to conduct research. What aspects need to be considered during the research? (multiple choices)

Options:

A.

Project Backbroom

B.

Customer needs

C.

Live network environment

D.

Component selection

Questions # 53:

The minimum number of nodes required for an OceanStor9000 cluster deployment is:

Options:

A.

2

B.

3

C.

4

D.

5

Questions # 54:

The customer needs RTO=0 and RPO=0 for the application business, which disaster recovery scheme should be used?

Options:

A.

Active and standby

B.

Double live

C.

3DC

D.

Cloud disaster tolerance

Questions # 55:

Which of the following statements about backup networking LAN-free and Server-free is correct?

Options:

A.

Server-free generates a copy during data backup, and the copy will be mounted to the backup server.

B.

Server-free networking can directly back up the backup data to the backup medium.

C.

LAN-free backup networking has no impact on production hosts.

D.

The path of LAN-free backup data stream is production storage -> backup server -> backup media.

Questions # 56:

(Judgment) Whether the Huawei OceanStor 9000 is upgraded online or offline, it has no impact on device management.

Options:

A.

True

B.

False

Questions # 57:

Based on the HyperMirror technology of the Huawei OceanStor storage array to achieve application-level local high availability, heterogeneous array failure

Zero data loss and zero business interruption (RPO=0, RTO=0).

Options:

A.

True

B.

False

Questions # 58:

In the Huawei backup solution, Server-Free backup networking involves snapshot technology, which component initiates the snapshot creation

Build order.

Options:

A.

Media server

B.

Backup proxy client

C.

Production storage D. Backup media

Questions # 59:

Regarding HyperMetro static priority arbitration mode, multiple choices are correct: (multiple choices)

Options:

A.

When an inter-array link failure occurs, or a non-priority site fails, the LUN on the priority site continues to provide services, and the non-priority site

The point LUN stops providing services.

B.

When the priority site array fails, the non-priority site will automatically take over the active-active service.

C.

When the priority site array is actively powered off for maintenance, the non-priority site array immediately takes over all active-active services and the services will not be interrupted.

D.

The static priority mode has higher reliability than the arbitration server mode.

Questions # 60:

Before deploying a disaster recovery plan, which information needs to be collected to choose more? (multiple choices)

Options:

A.

Production system equipment information

B.

Network information

C.

Business system

D.

Data volume

Viewing page 4 out of 15 pages
Viewing questions 46-60 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.