Spring Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Huawei HCIE-Storage H13-629 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam H13-629 Premium Access

View all detail and faqs for the H13-629 exam


864 Students Passed

95% Average Score

96% Same Questions
Viewing page 11 out of 11 pages
Viewing questions 101-110 out of questions
Questions # 101:

A research unit purchased a Huawei Oceanstor 9000 storage products, the main configuration products: 8 * Oceanstor 9000 C node, the front end 10GE * 2, CE6850 switch * 2, S5700 switch * 1, cables, lighting and other accessories are fully furnished, households communication deployment program, prepared in advance a list of IP planning programs and IP requirements. Which of the following IP address is needed? (Multiple choice.)

Options:

A.

The customer needs to provide 16 IP addresses for Oceanstor 9000 system back-end IP and need to provide a gateway.

B.

Customers need to provide nine management network IP addresses, of which eight for IPMI management, one for OM management.

C.

The customer management network must be interoperable with the OceanStor 9000 InfoEqualize DNS IP to access the OceanStor 9000 storage.

D.

The client needs to provide 49 IP addresses that can interoperate with client applications, 16 for the static front end, 32 for the dynamic front end, 1 for InfoWqualizer DNS IP.

Questions # 102:

In a media application scenario, large files is an important application feature. Huawei OceanStor 9000 can allocate different configurations according to different users. This avoids some of the unimportant data transition overhead, which of the following description of the quota is correct?

Options:

A.

The types of quotas include capacity quota and file quota.

B.

Quota methods include calculating quotas, soft quotas and mandatory quotas.

C.

Thesystem pre-allocates quotas for files before writing the file. When the user cancels the writing of the file being written, the system does not release a pre-allocated quota.

D.

When the user continues to write data, the quota information has been used inthe InfoAllocator interface real-time updates.

Questions # 103:

OceanStor 18000 hot backup strategy is set to high, all using 1TB hard drive when the hard disk domain, respectively, eight hard drives, 80 hard drives, 180 Hard disk, 280 hard disk, the system will be assigned how much hot spare space, in Terabytes?

Options:

A.

1,7,8,9

B.

1,7,15,24

C.

1,4,8,9

D.

1,5,7,9

Questions # 104:

When you install the Simpana backup client on a virtual machine and perform a backup, the backup job status becomes pending and reports an error message "Cannot decode packet header: invalid start signature ", which of the following may be the cause of this problem?

Options:

A.

VM NIC adapter error

B.

The media server backup service is abnormal

C.

The backup client service is abnormal

D.

Virtual machine disk class behavior IDE

Questions # 105:

The InfoEqualizer DNS IP address needs to be the same as the OceanStor 9000 front-end network and customer application network for network interoperability

Options:

A.

Correct

B.

mistakes

Questions # 106:

Information of the disaster recovery research Beijing project mainly includes three aspects (Who / What / Why)description. Which of the following is true? (Multiple choice.)

Options:

A.

A bank has more than XX customers and XX corporate customers.

B.

Loss of data will result in substantial loss of business interruption and may also result in significant financial loss.

C.

Business interruption has a huge impact, and the interruption time of business deployment <2h.

D.

Customers want to build two live-action data centers in the same city and realize double-live of the key business systems. The disaster recovery plan RPO = 0, RTO = 0

Questions # 107:

When the oracle database is in an open state, which of the following is the correct oracle database recovery action?

Options:

A.

Restore the entire data file

B.

roll back to the Council before crying to a certain point in time

C.

Recovery control file

D.

open state can not be restored action

Questions # 108:

Customers using 5 ESXI 5.5 hosts and configured DRS / HA, are seeing the error "HA insufficient resources" when the administrator starts the DB virtual machine. Using the HA configuration shown in the figure select the correct solution. (multiple choice)

Options:

A.

Stop one or more virtual machines

B.

Suspend one or more virtual machines

C.

Set the virtual machine restart priority

D.

Set host isolation response

Questions # 109:

Which of the following is not an authentication method supported by the OceanStor 9000 NFS protocol?

Options:

A.

LDAP authentication

B.

WSSE certification

C.

NIS certification

D.

AD domain certification

Viewing page 11 out of 11 pages
Viewing questions 101-110 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.