Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Huawei HCS-Pre-sales H19-311 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam H19-311 Premium Access

View all detail and faqs for the H19-311 exam


707 Students Passed

90% Average Score

94% Same Questions
Viewing page 2 out of 7 pages
Viewing questions 11-20 out of questions
Questions # 11:

The UPS5000-A-400/500K has good scalability, supporting a maximum of 0 to De used in parallel.

Options:

A.

2

B.

3

C.

4

D.

6

Questions # 12:

Which of the following elements shall be considered when configuring a UPS? (Multiple Choice)

Options:

A.

UPS model, capacity, and parallel system mode

B.

Battery brand and capacity

C.

Brand and model of the AC and DC cables

D.

Configuration of the battery rack and battery switch box

Questions # 13:

The UPS5000-E has good scalability, supporting a maximum of () UPSs to be used in parallel.

Options:

A.

2

B.

4

C.

6

D.

8

Questions # 14:

The UPS backup duration is typically within 30 minutes. It is reasonable to calculate the battery capacity with the galvanostatic method.

Options:

A.

TRUE

B.

FALSE

Questions # 15:

The UPS5000-A has an industry-leading efficiency. It keeps a high efficiency within a wide load range, which greatly reduces the operating expense (OPEX) for clients. The highest efficiency can be().

Options:

A.

0.95

B.

0.96

C.

0.97

Questions # 16:

The standard components and features in the typical configuration solution of the FusionModule500 include ().

Options:

A.

Water sensor, smoke sensor, temperature and humidity sensor, and door status sensor

B.

Water sensor, smoke sensor, temperature and humidity sensor, and mobile app

C.

Water sensor, smoke sensor, alarm notification over short messages, and video surveillance

Questions # 17:

NetEco solution can be configured in FusionModule2000 solution.

Options:

A.

TRUE

B.

FALSE

Questions # 18:

If the total current of a battery string is 1000 A and three battery strings are configured, the most economic cable configuration between the UPS and the main switch box is ():

Options:

A.

120 mm2 (382 A) x 3

B.

150 mm2 (441 A) x 3

C.

185 mm2 (506 A) x 3

D.

240 mm2 (599 A) x 3

Questions # 19:

Which of the following basic project information doesn't need to be entered manually before configuration quotation? ()

Options:

A.

Quotation No.

B.

Quotation name

C.

Representative office

D.

Customer name

Questions # 20:

The UPS5000-A features industry-leading reliability. Which of the following statements is correct about the UPS5000-A reliability design? (Multiple Choice)

Options:

A.

Strong power grid adaptability, 138-485 V voltage input range

B.

Conformal coated board

C.

Test guarantee of 1,400 items

D.

40°C without derating

Viewing page 2 out of 7 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.