Questions # 46:

NetCol8000-A013U 13kW small cooling capacity temperature control product adopts DC inverter compressor

Options:

A.

True

B.

False

Questions # 47:

The NetEco management system supports the function of user decentralization and domain division, so that different operation and maintenance personnel can only view the devices they manage. For example, by assigning permissions, an

operation and maintenance personnel can only view the equipment information of the computer rooms of several outlets.

Options:

A.

True

B.

False

Questions # 48:

The basic principles of refrigeration of air-cooled and water-cooled air conditioners are the same

Options:

A.

True

B.

False

Questions # 49:

The weak current module of the inter-row air conditioner of Fusionmodule2000 adopts dual power supply ()

Options:

A.

True

B.

False

Questions # 50:

FusionModule1000A V2R3 version can meet the seismic requirements of McFarland 9 earthquake /

Options:

A.

True

B.

False

Questions # 51:

What are the dimensions of Huawei cabinets? ()Multiple choice.

Options:

A.

800*1200* 2000

B.

800*1200*2200

C.

600* 1200* 2000

D.

600* 1200* 2200

Questions # 52:

UPS2000-G has the function of grading power off. When overloaded, the secondary load is turned off to eliminate the overload and ensure the quality of power supply. When the power is off, the secondary load is turned off to prolong the

backup time of the important load.

Options:

A.

True

B.

False

Questions # 53:

When configuring the battery, regardless of the brand of the battery, as long as the capacity is the same, it can meet customer requirements. (

Options:

A.

True

B.

False

Questions # 54:

The temperature cloud map is displayed intelligently in NetEco (

Options:

A.

True

B.

False

Questions # 55:

The integration between NetEco and eSight is a code-level integration. If you configure eSight products, you do not need to configure NetEco

Options:

A.

True

B.

False

Questions # 56:

The intelligent busway can replace the precision configuration cabinet and increase the number of IT cabinets

Options:

A.

True

B.

False

Questions # 57:

Neteco supports centralized management of multiple data centers ( )

Options:

A.

True

B.

False

Questions # 58:

The NeEco management system supports remote notification of alarms through SMS, email, etc., prompting users to deal with alarms as soon as possible.

Options:

A.

True

B.

False

Questions # 59:

The bypass module of UPS5000-E-200K (50kVA power module) is the same as the bypass module of UPS5000-E-300K

Options:

A.

True

B.

False

Questions # 60:

Each cooling section of the new room-level air-cooled series has two configurations of upper and lower air supply ()

Options:

A.

True

B.

False

Viewing page 4 out of 13 pages
Viewing questions 46-60 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.