Spring Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the IBM Certified Deployment Professional - Maximo Manage v8.0 C1000-132 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam C1000-132 Premium Access

View all detail and faqs for the C1000-132 exam


713 Students Passed

88% Average Score

96% Same Questions
Viewing page 2 out of 4 pages
Viewing questions 11-20 out of questions
Questions # 11:

When setting up a Crew Type, Required Crafts and Required Tools can be specified. What other characteristic can be required for the Crew Type?

Options:

A.

Required Assets

B.

Required Qualifications

C.

Required Labor

D.

Required Skills

Questions # 12:

What is the purpose of the Admin mode?

Options:

A.

change System Properties without needing to shut down the Maximo server

B.

perform Database Configuration without needing to shut down the Maximo server

C.

apply changes in Application Designer

D.

perform administrative functions

Questions # 13:

When using flow control on a Work Order, how ca from the Parent to Child Work Orders?

user ensure that Work Order status changes are inherited

Options:

A.

Check the Inherit Status Changes flag on the Work Order and ensure the mxe.app.wo.flowControlStatuslnheritance System Properties is set to 1.

B.

In the Organization application, check the Intarit Status Changes flag in Work Order Options -> Flow Control Options.

C.

Ensure the Asset or Location

on both the Parent and Child Work Order.

D.

Check the Roll Down Status Changes flag on the Parent and Child Work Order.

Questions # 14:

In the Preventive Maintenance (PM) application, how is the Estimated Next Due Date calculated when Adjust Next Due Date is selected?

Options:

A.

Extended Date + Alert Lead (Days)

B.

Extended Date + Frequency

C.

Extended Date + Target Start Time

D.

Extended Date -Alert Lead (Days)

Questions # 15:

In the Work Order Tracking application, a Work Order is generated from a Preventive Maintenance (PM) record. How is the target finish date calculated?

Options:

A.

the Job Plan finish date

B.

the PM target finish date

C.

the Work Order target start date + the Job Plan duration

D.

the Job Plan start date + the Job Plan duration

Questions # 16:

In the Master PM application, which two meter-based fields can be updated on associated Preventive Maintenance records? (Choose two.)

Options:

A.

Estimation Type

B.

Current Meter Reading

C.

Generate WO Ahead By

D.

Meter Type

E.

Frequency

Questions # 17:

In the Receiving application, what are the three statuses that show the overall receipt status of the purchase order?

Options:

A.

COMPLETE

B.

RETURNED

C.

PARTIAL

D.

NONE

E.

WINSP

F.

VOID

Questions # 18:

In the Work Order Tracking application, when using the Select Value on the Safety Plans field from where can the safety plan be derived?

Options:

A.

Safety Plans that are referenced in the Location Hierarchy.

B.

The Safety Plan that is associated with the Preventive Maintenance record.

C.

It always shows Active Safety Plans that are in the same site as the work order.

D.

Safety Plans where the Location or Asset on the Work Order is referenced as a Work Asset on the Safety Plan.

Questions # 19:

In the Assets application when reporting downtime, what is an example of a Downtime Type?

Options:

A.

Starting Up

B.

Line Change Over

C.

Shutting Down

D.

Non-Operational

Questions # 20:

What are three statuses used in the Service Requests application? (Choose three.)

Options:

A.

COMPLETED

B.

ENTERED

C.

RESOLVED

D.

QUEUED

E.

APPROVED

F.

PENDING

Viewing page 2 out of 4 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.