Halloween Sale Special Limited Time 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = drift75
Pass the iSQI ISQI certification CTAL-TAE_V2 Questions and answers with ExamsMirror
Exam CTAL-TAE_V2 Premium Access
View all detail and faqs for the CTAL-TAE_V2 exam
404 Students Passed
87% Average Score
96% Same Questions
Which of the following is the BEST example of how static analysis tools can help improve the test automation code quality in terms of security?
Consider choosing an approach for the automated implementation of manual regression test suites written at the UI level for some already developed web apps. The TAS is based on a programming language that allows the creation of test libraries and provides a capture/playback feature that allows recognition and interaction with all widgets in the web UIs being tested. The automated tests will be implemented by team members with strong programming skills. The chosen approach should aim to reduce both the effort required to maintain automated tests and the effort required to add new automated tests. Which of the following approaches would you choose?
Automated tests run by a TAS on a SUT can be subject to sudden bursts of messages to log during their execution. All log messages that occur during execution must be permanently stored in the corresponding test execution logs by the TAS for later analysis. If logging is not performed correctly, these bursts can reduce the execution speed of these automated tests, causing them to produce unreliable results. Which of the following solutions would you expect to be MOST useful to address this issue for TAS logging?
Your company is about to start a project to replace an old sales and merchandising system with a new version that will be based on modern platforms. The main requirements for the system are:
1. Loading sales data, sent electronically from the stores each evening, into a central database.
2. Producing sales reports for the merchandisers, whose job is to manage stock levels in stores.
3. Producing forecast reports, used to predict future demand for each product, based on a combination of sales history and forecasting parameters. The parameters will be entered by the merchandisers into a browser-based front end and the reports will be produced overnight. The users will be able to retrieve the reports, on screen or in print, via an interactive feature.
Requirements 1 and 2 were already met by the old system and will be rewritten in the new system with some minor functional changes. The sales data will, as before, be loaded in an overnight batch run. There have been problems with the old system at peak periods when this run has taken longer than scheduled, so that dependent jobs could not finish before the start of the next working day. The Data Centre manager requires that the new system's overnight batch runs take 10% less time than the old one, including the new reports, to allow time for all jobs to complete.
Requirement 3 is new. The functionality provided by the UI will be simple and the Sales & Merchandising manager requires that it be easy to use.
The data for testing the reports will be extracted from the old system in production and will be anonymized before use.
The system will be developed using an Agile lifecycle with iterations of fixed length. This will be the first full deployment of this methodology, which has just completed a successful pilot. It is a relatively simple development and is expected to be completed in three releases, each taking approximately two months.
Until now the company has not automated test execution, but the Agile pilot identified this as a critical success factor. You are an experienced TAE and have been recruited to implement test automation, and you are now considering what the TAS for this should look like.
Which option contains the THREE MOST important considerations in determining the nature of the TAS that will be needed for this project?
i) The tool(s) chosen for functional test automation should support scripting techniques that will be compatible with a performance test tool.
ii) The tool(s) chosen for functional test automation should support scripting techniques that will be useful for usability testing.
iii) The TAS should support testing at the component integration, system, system integration and acceptance levels.
iv) The TAS should support testing at the component, component integration, system and acceptance levels.
v) The TAS should support the handling of the large quantities of data that will be needed to test the forecast reports.
Your company is about to start a project to replace an old sales and merchandising system with a new version that will be based on modern platforms. The main requirements for the system are:
1. Loading sales data, sent electronically from the stores each evening, into a central database.
2. Producing sales reports for the merchandisers, whose job is to manage stock levels in stores.
3. Producing forecast reports, used to predict future demand for each product, based on a combination of sales history and forecasting parameters. The parameters will be entered by the merchandisers into a browser-based front end and the reports will be produced overnight. The users will be able to retrieve the reports, on screen or in print, via an interactive feature.
Requirements 1 and 2 were already met by the old system and will be rewritten in the new system with some minor functional changes. The sales data will, as before, be loaded in an overnight batch run. There have been problems with the old system at peak periods when this run has taken longer than scheduled, so that dependent jobs could not finish before the start of the next working day. The Data Centre manager requires that the new system’s overnight batch runs take 10% less time than the old one, including the new reports, to allow time for all jobs to complete.
Requirement 3 is new. The functionality provided by the UI will be simple and the Sales & Merchandising manager requires that it be easy to use.
The data for testing the reports will be extracted from the old system in production and will be anonymized before use.
The system will be developed using an Agile lifecycle with iterations of fixed length. This will be the first full deployment of this methodology, which has just completed a successful pilot. It is a relatively simple development and is expected to be completed in three releases, each taking approximately 2 months.
You are an experienced TAE and have been recruited to implement test automation on this project and have started to evaluate candidate tools to automate functional and some non-functional testing. It is already clear that no single tool will meet all requirements, and that the developers’ existing Integrated Development Environment will meet the automation needs of their testing. The TAS will need to support CI/CD.
When reviewing your tool comparison table, what two tool capabilities will be MOST beneficial for this project?
i) The ability to support multiple and configurable test environments.
ii) The ability to manage test data in a way that supports version control of the data sets.
iii) The ability to be compatible with other tools that are likely to be used on the project.
iv) The ability to expand the overall test architecture and to be scalable and modifiable.
v) The ability for non-technical users to enter requests for customizable reports.
You are employed as a TAE on a project to build a purchasing system. The main requirements for the system are:
1) Allow users to enter details of items that they wish to have purchased and, from these details, create a purchase request.
2) Take each purchase request through a workflow that will allow the requestor’s line manager to approve the request, reject it, or return it for clarification/modification.
3) Forward approved requests to the Purchasing Department.
4) Allow purchasers to find the best available supplier and place the request on that supplier as a purchase order.
Requirement 1 has now been delivered and has been satisfactorily tested manually. In parallel, you have developed a TAS so that functional suitability testing can be automated.
You have just conducted a pilot of the TAS on the implementation of Requirement 1 and several things went wrong:
• One test failed because some reference data that it needed was missing. This and several other failures were difficult to diagnose.
• Another test failed unexpectedly because an old version of the script was used.
Which three measures could mitigate these risks during deployment?
a) Full test logging down to and including trace level
b) Identification and correct configuration of all firewalls
c) Automated creation and loading of all data to meet test preconditions
d) Provision of proper device configuration plans
e) Careful packaging with thorough configuration management
A suite of automated test cases was run multiple times on the same release of the SUT in the same test environment. Consider analyzing a test histogram that shows the distribution of test results (pass, fail, etc.) for each test case across these runs. Which of the following potential issues is MOST likely to be identified as a result of such an analysis?
Which of the following statements about contract testing is TRUE?
In a first possible implementation, the automated test scripts within a suite locate and interact with elements of a web UI indirectly through the browsers using browser-specific drivers and APIs, provided by an automated test tool used as part of the TAS. In an alternative implementation, these test scripts locate and interact with elements of the same web UI directly at the HTML level by accessing the DOM (Document Object Model) and internal JavaScript code. The first possible implementation:
Which items should be included in a report that is produced after execution of a test suite?
TOP CODES
Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.