Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the iSQI Agile Tester CTFL-AT Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam CTFL-AT Premium Access

View all detail and faqs for the CTFL-AT exam


684 Students Passed

92% Average Score

94% Same Questions
Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions
Questions # 21:

Which one of the following is a testable acceptance criterion?

Options:

A.

The solution shall support business processes.

B.

The system shall be easy to use.

C.

The response time to confirm a customer submission must not exceed 5 seconds.

D.

The tools for testing are tested before use and are meeting the requirements.

Questions # 22:

A calculator application is being developed. The third sprint has been planned to add functionality to the calculator to allow scientific calculations.

Which TWO examples below represent activities that would likely be managed on an agile task board for the third sprint?

1) A task to design the features planned for the next sprint.

2) A task to run an acceptance test for a user story.

3) A task to automate regression tests.

4) A task to participate in training in preparation for the fourth sprint.

5) A task to produce a daily progress report for the agile team members.

Options:

A.

2, 3

B.

1, 4

C.

4, 5

D.

1, 5

Questions # 23:

Based on the skills required for testers in Agile teams, which of the following activities would you expect least likely to be performed by testers in Agile projects?

Options:

A.

Tracking the failures of the unit tests that are written when using the Test-Driven Development practice

B.

Identifying and updating test cases from previous iterations that are affected by the changes made in the current iteration

C.

Working collaboratively with a developer to develop and test a feature

D.

Actively participating in specification workshops aimed at clarifying user stories through examples that will be transformed into tests

Questions # 24:

You are developing the code that controls an industrial Espresso machine which will be operated by waiting staff in restaurants.

The machine is rather complicated and has lots of switches and buttons, so in the next iteration instructions will be provided to the operator on a small LCD screen.

A User Story for the Operator-Instructions module is as follows:

"As an operator of the Espresso machine, I would like to know how to steam milk, so I can add steamed milk to the coffee."

The following is a list of risks identified for this story, with assigned probability and impact.

Options:

A.

Operators will not read the instructions and will try various switches and buttons until something works. Probability: Low. Impact: Low

B.

The instructions may be incorrect or appear in the wrong order. Probability: Low. Impact: High

C.

An untrained customer will attempt to use the coffee machine. Probability: High. Impact: High

D.

A small child may try to steam milk. Probability: High. Impact: Low

Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.