Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = simple70

Pass the ISTQB Test Automation Engineer CT-TAE Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam CT-TAE Premium Access

View all detail and faqs for the CT-TAE exam


342 Students Passed

88% Average Score

94% Same Questions
Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
Questions # 1:

You are planning the pilot for an in-house developed Test Automation solution (TAS).

Which two of the following would be important steps to take as part of the planning process?

a) Review your organisation's current projects and identify which one would be most suitable to pilot the TAS.

b) Ensure that the developers will provide the necessary commitment for the TAS deployment activities.

c) Run a series of training workshops for new users of the TAS before they are asked to use it.

d) Develop a project plan for the pilot and reserve the necessary budget and resources for its implementation.

e) Ask the developers to provide any missing functionality during the deployment activities.

Options:

A.

a and b

B.

b and d

C.

c and d

D.

c and e

Questions # 2:

Your TAS has been running successfully on a Windows/GUI based SUT for some years. The SUT has undergone minimal change over the years to maintain business as usual, deploying six-monthly releases for minor enhancements and bug fixes using a waterfall lifecycle.

The TAS has not changed at all during this period. The current project for the SUT will be using the Scrum methodology to deliver a more modern, competitive, user interface. It is in the release planning stage with an agreed release backlog and set of sprints outlined.

The move from lengthy waterfall releases to shorter sprints has led you to conduct a review of the current TAS to make sure it is robust and fully optimised for the timescale challenges of the new project.

What two steps would be BEST to undertake during the review?

a) Ensure that new automation code is using the same naming conventions as existing code.

b) Perform a full regression run in Sprint 1 to identify what improvements could be made to the TAS for future sprints.

c) Ensure that the TAS is using the latest libraries for the operating system.

d) Review the functions that act upon the controls for the GUI for possible consolidation.

e) Involve the test team to see what ease-of-use improvements they would like to see made to the TAS.

Options:

A.

c and d

B.

b and c

C.

a and b

D.

d and e

Questions # 3:

If model-based testing has been selected for the overall test automation approach for a project, how does that influence the layers of the TAA?

Options:

A.

All layers are used, but the test generation layer will be automated based on the defined model

B.

There will be no need for the execution layer

C.

No adaptation will be needed because the interfaces will be defined by the model

D.

There will be no need to design the tests for the API because those will be covered by the model

Questions # 4:

Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

Options:

A.

Summary of the test execution results

B.

System/Application under test and its version

C.

Defect clusters identified during test execution

D.

Environment in which the tests have been executed

Questions # 5:

Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.

What is the BEST approach to confirm the correct functioning of the TAS in this scenario?

Options:

A.

Verify the behavior of the automated tests by running a small tests, then gradually run the remaining tests to confirm the correct functioning of the whole automated test suite.

B.

Make sure that the infrastructure team has completed installing the service pack on the machines where SUT is running, then run the whole automated test suite to verify its behavior

C.

Verify the behavior of the whole automated test suite by running all the automated tests

D.

Do not run any tests because you can immediately confirm the correct functioning of the automated test suite

Questions # 6:

You are evaluating several test modelling tools and are wanting to automatically generate test cases within the tool where many different combinations of input data are created.

You are then wanting to export the test cases into a csv file which can then be read by a functional test execution tool using a data-driven or keyword-driven scripting method.

You have investigated several tools and there is only one tool that provides all the necessary features defined by your team with the exception of the export facility. It does not provide an export into either .xls or .csv formats.

What would be the BEST next step regarding the selection of this tool?

Options:

A.

Consider another tool that is more “fit for purpose" and has all the features required.

B.

Explore the possibility of creating your own export facility.

C.

Ask the vendor and use forums to see if a solution is available or going to be available in the future.

D.

Purchase this tool and generate the .csv file manually.

Questions # 7:

You have been asked to implement test automation for a project that is not meeting its deadlines. After further analysis you discover that the manual testers are not able to keep up with the new feature testing because the regression testing is taking 75% of their time. As a result, the new features are being released with many defects and customers are complaining about the quality.

Given this information, what metric SHOULD you be tracking to show the value of test automation for this project?

Options:

A.

Percentage of code covered by the test automation.

B.

Equivalent Manual Test Effort for the automated tests.

C.

Number of defects found by test automation.

D.

Percentage of builds accepted/rejected by the automated tests.

Questions # 8:

You are implementing test automation for a project and you want to be able to generate test cases automatically using a series of test design tools which use a variety of test design techniques such as decision tables, pairwise testing and boundary value analysis.

You also want to generate test data automatically which can then be used by the tests.

Initially these tests will be run manually to verify their correctness and ultimately you want to include them in the test execution tool so that they can run unattended.

Which layer of the gTAA will be used to support the specification of the test cases and preparation of the test data?

Options:

A.

The generation layer

B.

The definition layer

C.

The execution layer

D.

The adaptation layer

Questions # 9:

Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?

Options:

A.

All the interaction between SUT and TAS should be logged with the highest level of detail

B.

All the internal test interfaces of the SUT should be removed prior to the product release

C.

All the interface of the SUT affected by the tests should be controllable by the TAA

D.

All the external test interfaces of the SUT should be removed prior to the product release

Questions # 10:

Which of the following is NOT a technical design consideration for a TAA?

Options:

A.

The number of users for the SUT

B.

Availability of interfaces for the SUT to be testable

C.

Standards and Legal requirements, e.g data privacy

D.

Data used by the SUT, e.g configuration, users

Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.