Spring Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the ISTQB Test Automation Engineer CT-TAE Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam CT-TAE Premium Access

View all detail and faqs for the CT-TAE exam


658 Students Passed

91% Average Score

93% Same Questions
Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions
Questions # 21:

Consider a TAS associated to dynamically changing software frequent releases. Your goal is to determine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.

What is the MOST important metric to collect to achieve your goal?

Options:

A.

The code coverage achieved with the automated tests, for each new release of the SUT

B.

The number of automated tests which fail because of a single software defect, for each new release of the SUT

C.

The time it takes to execute all the automated tests, for each new release of the SUT.

D.

The number of automated tests requiring maintenance, for each new release of the SUT.

Questions # 22:

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

Options:

A.

Re-run the test automation suite starting from the 12th test

B.

Return the database to a consistent state that allows subsequent test to run

C.

Take a backup of the database in its current state. So It can be analyzed later

D.

Re-run the test automation suite starting from the 1st test.

Questions # 23:

You are reviewing the testability of your SUT.

Which of the following BEST refers to the characteristic of OBSERVABILITY?

Options:

A.

The ability of the SUT to perform its intended function for a specified period of time

B.

The ability to exercise the SUT by entering inputs, triggering events and invoking methods

C.

The ability of the SUT to prevent unauthorized access to its components or data.

D.

The ability to identify states, outputs, intermediate result and error messages in the SUT

Questions # 24:

Your company is new to test automation and as TAE. you have designed a TAS which successfully supports the SUT for the current project.

There are other systems currently in operation which have been tested manually and more systems are planned over the coming years. Based on this success, your company requires test automation be rolled out to other current and future SUTs with consistency being a key objective.

Which of the following is the BEST way to achieve that?

Options:

A.

Design a new TAS for each SUT, and manage each one through a dedicated automation support team.

B.

Install the current TAS into a central repository so that other tests on different SUTs use the same version of the TAS.

C.

Check for correct connectivity to internal and external systems to ensure that the TAS has been installed and configured correctly for each SUT.

D.

Develop a tool that keeps track of automation failures across the different SUTs and produces regular reports to stakeholders.

Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.