Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Microsoft Certified: Dynamics 365 Supply Chain Management Functional Consultant Expert MB-335 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam MB-335 Premium Access

View all detail and faqs for the MB-335 exam


726 Students Passed

85% Average Score

96% Same Questions
Viewing page 3 out of 7 pages
Viewing questions 21-30 out of questions
Questions # 21:

You need to configure the bicycles’ production resource.

Which option should you use?

Options:

A.

Exclusive capacity set to yes and enter a Batch capacity.

B.

Exclusive capacity set to no and infinite capacity.

C.

Exclusive capacity set to yes and infinite capacity.

D.

Exclusive capacity set to no and enter a Batch capacity.

Questions # 22:

You need to configure the manufacturing groups for the standard model bicycle and the new limited-edition bicycle for the summer season.

Which object should you use?

Options:

A.

Commerce channels

B.

Operating units

C.

Teams

D.

Legal entities

E.

Departments

Questions # 23:

You need to report newly manufactured bicycles as finished products.

Which three options can you use? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Route card journal

B.

Standard production order update

C.

Handheld warehouse device

D.

Job card journal

E.

Report as finished journal

Questions # 24:

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

Options:

A.

Run inventory close for the BOM items for the limited-edition bicycle.

B.

Create the production order for the limited-edition bicycle and click estimate.

C.

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.

Run the pricing simulator for the limited-edition bicycle for a quantity of one.

Questions # 25:

You need to plan scheduling for Customer1’s order of unscented solution.

What are two possible ways to achieve the goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Schedule production based on the availability of raw material.

B.

Split and plan operations in detail for each of the resources.

C.

Schedule productions based on the capacity of the resources.

D.

Run master planning with a specific time fence.

E.

Plan scheduling of the production at the resource group level.

Questions # 26:

You need to configure production operations for the pine and orange scent solutions.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.

B.

Use a purchase agreement as a service agreement.

C.

Allocate subcontracted work in its own cost breakdown block.

D.

Configure a costing resource and requirement to point to a Vendor type resource.

E.

Configure the BOM line to be of type Vendor and associate the corresponding vendor account.

Questions # 27:

You need to implement the scheduled Kanban requirements.

Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Question # 27

Options:

Questions # 28:

You need to resolve the production manager issue.

How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Question # 28

Options:

Questions # 29:

You need to configure production control parameters for liquid cleaning solution manufacturing.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Require an electronic signature when the formula is approved.

B.

Select Block editing and approve the formula.

C.

Select the Block removal of approval option for the formula

D.

Select the Block editing option only.

D18912E1457D5D1DDCBD40AB3BF70D5D

Questions # 30:

You need to resolve the shop supervisor’s issue.

Which options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Question # 30

Options:

Viewing page 3 out of 7 pages