Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Nutanix NCS Professional NCS-Core Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam NCS-Core Premium Access

View all detail and faqs for the NCS-Core exam


720 Students Passed

92% Average Score

98% Same Questions
Viewing page 4 out of 10 pages
Viewing questions 31-40 out of questions
Questions # 31:

As a part of a cluster deployment test plan, a customer asks the consultant for some additional performance and resiliency tests.

How should the consultant best satisfy this request?

Options:

A.

Deploy X-Ray and conduct any relevant tests.

B.

use Apache Jmeter.

C.

Run diagnostics.py directly from CVM.

D.

Leverage lometer.

Questions # 32:

Which container advanced setting should be configured to prevent ISO container images from exceeding a 100GB limit.

Options:

A.

Reserved capacity

B.

Advertised capacity

C.

Erasure coding

D.

Compression

Questions # 33:

A customer needs a DR solution designed around the following requirements:

• There are 8 ms of latency between Sites A and B

• The administrator needs the shortest RPO/RTO possible

• Application consistent snapshots are required

• Use of Nutanix VSS

Which Data Protection Method should be used?

Options:

A.

Async

B.

Metro Availability

C.

Near Sync

D.

Cloud Connect

Questions # 34:

A system administrator needs to shut down an AHV node in a Nutanix cluster without causing service disruption. The administrator checks data resiliency and verifies that the cluster can tolerate a node down.

Which three steps should the administrator perform next? (Choose three.)

Question # 34

Options:

Questions # 35:

A customer needs to meet the following requirements for their business critical application:

* SQL Servers must be on specific hosts to lower licensing costs.

* Oracle RAC servers must be on separate hosts for licensing reasons

Which policy or policies should be implemented to meet these requirements?

Options:

A.

Configure VM-VM anti-affinity policy.

B.

Configure VM-VM affinity policy.

C.

Configure both VM-Host and VM-VM affinity policy.

D.

Configure VM-Host affinity policy.

Questions # 36:

A consultant installs a new AHV cluster and moves the cluster into the customer's environment. Alter the move, the consultants notice that traffic is not being balanced across the physical NICs. The ToR switches have been configured with LACP.

Within Prism Element, which AHV network option should be set to resolve the issue?

Options:

A.

Active-Backup

B.

Active-Active

C.

No Uplink Bond

D.

Active-Active with MAC Pinning

Questions # 37:

Over the period of 2 to 3 weeks, a cluster displays the following:

•Periods where Warning Alerts of memory usage over 75% are asserted

•Periods where Critical Warnings of memory usage over 90% are asserted

•Periods of slow of frozen VDI desktops have caused work stoppage or slowdown

•VDI clones have periodically not powered up when called, causing work stoppage

Which steps should be used to prioritize the administrator’s troubleshooting efforts?

Options:

A.

•Assess resource health on Hardware page

•Review the Analysis page for memory usage demand

•Determine the VDI workload-to-host affinity across the cluster

B.

•Analyze Alert Pages for a root cause of memory problem

•Analyze VM table page to access the VM functionality

•Analyze the VDI Clone properties for possible VDI Workload stress

C.

•Check Analysis page for CPU demand

•Verify VDI workload property for memory subscription

•Review the Hardware page to determine if the cluster has sufficient RAM

D.

•Review Analysis Page for memory use pattern

•Alert with VDI workload demand

•Analyze current and future workload in the Capacity Runaway tab for sufficient resources

Questions # 38:

During the cluster deployment, a consultant conducts operational tests on a vCenter-managed ESXi hypervisor.

As a part of tests, vCenter must place the host into maintenance mode, however, the task is stuck and the CVM is not shutting down automatically.

What should the consultant do to resolve the issue?

Options:

A.

Shutdown the CVM using cvn_shutdown -P now.

B.

Put the node into maintenance mode using

C.

acli host.enter_maintenance_mode Hypervisor address.

D.

Put the node into maintenance mode using ’-/serviceability/bin/esx-shutdown

-s cwn_.£p_addr

E.

Shutdown the CVM using shutdown -h now.

Questions # 39:

The following alert appears on the file server alerts tab in the file server dashboard:

Question # 39

Which two events can generate this alert? (choose two)

Options:

A.

A three-node duster hosting the file server is undergoing AOS upgrade.

B.

A node failed in a three-node cluster.

C.

A Nutanix file with four hie server VMs is deployed on a three-node duster.

D.

A node is set to the maintenance mode in a three node cluster.

Questions # 40:

Where in the Support Portal can it be determined if a version of AOS is supported on a particular hardware platform.

Options:

A.

Solution Documentation

B.

Upgrade Paths

C.

Hardware Compatibility Lists

D.

Compatibility and Interoperability Matrix

Viewing page 4 out of 10 pages
Viewing questions 31-40 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.