Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Oracle Manufacturing Cloud 1z0-1075-25 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam 1z0-1075-25 Premium Access

View all detail and faqs for the 1z0-1075-25 exam


766 Students Passed

89% Average Score

95% Same Questions
Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
Questions # 11:

To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.

Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?

Options:

A.

Work definition header and version attributes

B.

Descriptive flexfields (OFFs) at any level

C.

Item structure component attributes referenced from Product Information Management(PIM)

D.

Attachments at any level

E.

Operation resources. Including alternate resources

Questions # 12:

Your customer needs to add additional information to their work order traveler. Which statement is NOT true about the Extensible Work Order Traveler?

Options:

A.

You can generate the Extensible Work Order Traveler report only from the Review Dispatch List and Manage Supplier Operations pages.

B.

It is a critical document that travels with the physical material during production.

C.

The production operator can invoke It from the Manage Work Orders, Review Dispatch ust. and Manage Supplier Operations pages.

D.

Operators can invoke it by using the Generate Extensible Work Order Traveler Report task.

E.

You use Page Composer to display only the required actions.

Questions # 13:

Which is NOT a required setup task for Manufacturing master data?

Options:

A.

Manage Production Resources

B.

Manage Plant Parameters

C.

Manage Work Centers

D.

Manage Work Areas

E.

Manage Plant Profiles

Questions # 14:

A Production Operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.

Which task should the operator select to review all the transactions in a single place for both work order and orderless execution?

Options:

A.

Report Resource, Material, and Operation Transactions

B.

Manage Work Orders

C.

Review Production Transaction History

D.

Review Dispatch List

Questions # 15:

Two work definitions are created in the application: one for Engine Finished Good and the other for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Good as one of its components.

How can you establish the relationship between the Pallet and Engine work definitions?

Options:

A.

Create a subinventory to serve as the completion subinventory for yielding Pallet, and then use the same subinventory to serve as the supply subinventory of Pallet in the work definition created for Engine.

B.

Work definition versions can be used to tie the work orders.

C.

Assign a higher priority to the work definition created for Engine and a lower one to the work definition for Pallet.

D.

The two work definitions can be tied through Project or Selban numbers.

Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.