Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Oracle Utilities Customer Cloud 1z0-996-22 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam 1z0-996-22 Premium Access

View all detail and faqs for the 1z0-996-22 exam


666 Students Passed

87% Average Score

97% Same Questions
Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
Questions # 11:

The base package usage transaction business object is represented by D2-UsageTransaction.The usage calculation engine or process drives the specifics of the usage to be calculated on this business object.

Based on this, which three configuration areas will have an impact on the usage calculation process? (Choose three.)

Options:

A.

VEE rule

B.

TOU map

C.

Usage Rule

D.

Factor Override

Questions # 12:

Which describes derived values and their relationship with Final Measurements?

Options:

A.

Final Measurementscan have multiple derived values, which represent other values for the same Final Measurement Date/Time.

B.

Derived values can have multiple Final Measurements, which represent other values for the same InitialMeasurement Date/Time.

C.

Final Measurementscan have one derived value, which represents an alternative for the same FinalMeasurement Date/Time.

D.

Final Measurements can have one derived value, which represents the Initial Measurement for the sameFinal Measurement Date/Time.

Questions # 13:

On which three entities can proration be disabled? (Choose three.)

Options:

A.

Calculation Rule Business Object

B.

Bill Factor

C.

Calculation Rule

D.

Rate Version Calculation Group

E.

Rate Schedule

Questions # 14:

Throughout its lifecycle, an asset’s disposition changes as it is moved between locations and service statuses.

Which are valid asset dispositions?

Options:

A.

Receiving; Installed; Storage; Retired

B.

In Receipt; In Field; In Stores; Retired

C.

InReceipt; Installed; In Stores; Retired

D.

Receiving; In Field; Storage; Retired

Questions # 15:

What contains the details of how a bill was calculated and how it will be printed on a bill?

Options:

A.

Calculation Rules

B.

Rate Schedule

C.

Service Agreement

D.

Bill Segments

E.

Bill

Questions # 16:

How should you configure the derived values that are relevant for a device?

Options:

A.

Configure the derived values on the Measuring Component for the measuring components to be defined on the device.

B.

Configure the derived values on the Measuring Component Type for the measuring components to be defined on the device.

C.

Configure the derived values on the DeviceType for the derived values to be defined on the device.

D.

Configure the derived values on the Final Measurement Type for the measuring components to be defined on the device.

Questions # 17:

There has been a meter exchange at a service point in the past year.

How many installation events exist for the service point for the past year?

Options:

A.

Two

B.

One

C.

Four

D.

None

E.

Three

Questions # 18:

Your client has three requirements:

1. Apply validations on meter reads coming from the Data Collectors.

2. If a meter read does not pass the validation, an error will be generated and assigned to a user.

3. Retry the validation every 30minutes for the errors in case the issue is related to configuration.

Which statement describes the base functions you should use?

Options:

A.

If a To Do entry is created on the VEE exception, the IMD’s Next Retry Date/Time is set to 30 minutes, andthen processedby the algorithm D1-COMP-TD (Complete To Do Entries).

B.

If a To Do entry is created on the VEE exception, the IMD’s Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-IMD-RETRY (Retry Initial Measurement Data Processing)

C.

If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be loaded after 30 minutes.

D.

If a To Do entry is created on the VEE exception, the IMD’s Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-CRE-IMDTD (Create To Do)

E.

If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be manually loaded.

Questions # 19:

New: An electric utility is starting an Advanced Meter Infrastructure (AMI) roll-out for their residential customers. The initial plan is to roll out devices from their manufacturer with potentially three different device models. The customer has not decided what head-end systems they will use to communicate with these devices. Based on the customer’s initial roll-out strategy, the devices will haveto be configured consistently to support existing tariffs for billing.

Which is a valid consideration to determine the setup of device type administrative data for this implementation?

Options:

A.

billing usage rules

B.

the model number

C.

the device’s date of manufacturer

D.

valid head-end systems, valid device configuration types, and the electricity service type

Questions # 20:

Which statement correctly describes the relation between a device and a measuring component?

Options:

A.

A device configuration links a device only to interval channels.

B.

Two measuring components on the same device should have the same Units of Measure (UOM).

C.

A device should have only one measuring component type.

D.

A device can have any combination of interval and/or scalar measuring components.

Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.