Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the SAP Certified Application Associate C_TPLM30_67 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam C_TPLM30_67 Premium Access

View all detail and faqs for the C_TPLM30_67 exam


757 Students Passed

95% Average Score

95% Same Questions
Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
Questions # 11:

What do you use to set up a refurbishment order for external refurbishment?

Options:

A.

An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.

B.

An external operation that contains a control key for refurbishment.

C.

An order type for external refurbishment and an assignment of a material with split valuation.

D.

An order type for external refurbishment and a material item with item category External Refurbishment.

Questions # 12:

What does the notification type define? (Choose three)

Options:

A.

The reference object view

B.

The catalog or catalog profile

C.

The scheduling type

D.

The planner group

E.

The number assignment of the notification

Questions # 13:

How can you maintain a distribution rule? (Choose two)

Options:

A.

Manually, prior to the first settlement

B.

Automatically, according to value categories in the order

C.

Manually, after the business completion for the order

D.

Automatically, based on a combination of Customizing and object master data

Questions # 14:

What options are available in the maintenance order when you analyze costs using value categories? (Choose two)

Options:

A.

Display of costs by responsible work center

B.

Display of costs by individual operations

C.

Display of values in an alternate currency

D.

Summary of actual costs across multiple cost elements

Questions # 15:

Which of the following information can the shift report display? (Choose three)

Options:

A.

Planned and actual costs for shifts

B.

Digital signatures for approval of a shift report

C.

Maintenance plans and task lists

D.

Maintenance orders and notifications

E.

Measurement documents and goods movements

Questions # 16:

When you create a refurbishment order, which reference objects can you use? (Choose three)

Options:

A.

Functional location

B.

Equipment without serial number

C.

Material with serial number

D.

Material without serial number

E.

Equipment with serial number

Questions # 17:

What are the prerequisites for creating a capacity requirement in a maintenance order operation? (Choose two)

Options:

A.

The performing work center must have available capacity data.

B.

The performing work center must have a control key with the Determine Capacity Requirements indicator set.

C.

The numeric value for Work in the order operation must be greater than 0.

D.

The operation must have a control key with the Determine Capacity Requirements indicator set.

Questions # 18:

Which of the following is a function of deadline monitoring (transaction IP30)?

Options:

A.

Generate a Logistics Information System (LIS) report for scheduled maintenance items within a specific period.

B.

Convert maintenance notifications into maintenance orders within a specific period.

C.

Convert maintenance calls into call objects within a specific period.

D.

Generate a Logistics Information System (LIS) report for all overdue maintenance calls.

Questions # 19:

Your customer uses operating hours to execute a performance-based maintenance plan.

Which of the following data must you assign in the maintenance plan header?

Options:

A.

A task list for performance-based maintenance

B.

A cycle unit of measure with a corresponding characteristic from the measuring point

C.

An order type for performance-based maintenance

D.

A technical object with a measuring point

Questions # 20:

Your customer wants to create a component for maintenance that does not allow physical inventory.

Which material type must you use?

Options:

A.

Spare parts (ERSA)

B.

Maintenance assembly (IBAU)

C.

Non-valuated materials (UNBW)

D.

Operating supplies (HIBE)

Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.