Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Scrum Professional Scrum Developer PSD Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam PSD Premium Access

View all detail and faqs for the PSD exam


728 Students Passed

89% Average Score

93% Same Questions
Viewing page 4 out of 5 pages
Viewing questions 31-40 out of questions
Questions # 31:

Which are four attributes of a good bug report?

Options:

A.

Screenshots or pictures of the bug in action, if possible

B.

Explains some new system functionality desired

C.

Includes build or version number where bug was found

D.

Expected results and observed results

E.

Provides simple and repeatable reproduction steps

F.

Includes code for a proposed fix

Questions # 32:

What is static analysis?

Options:

A.

Analysis performed on software at runtime

B.

A tool that inspects the correctness of static keyword usage

C.

Work performed by the business analyst

D.

Analysis performed on code

Questions # 33:

True or False: Product documentation may be required as part of a working Increment.

Options:

A.

True

B.

False

Questions # 34:

The three pillars of empirical process control are:

Options:

A.

transparency

B.

planning

C.

inspection

D.

respect

E.

commitment

F.

adaptation

Questions # 35:

Which are topics of the sprint planning? Choose all that apply.

Options:

A.

Why is this sprint valuable?

B.

When is this sprint going to be done?

C.

How to improve the scrum process in this sprint?

D.

How will the selected work get done?

E.

What can be done in this sprint?

F.

Who is going to do what?

Questions # 36:

Which four are benefits of TDD?

Options:

A.

It promotes good design and separation of concerns

B.

It causes you to construct a test harness that can be automated

C.

It improves quality and reduces bugs

D It reduces the cost of maintenance over time

D.

It ensure there will be no bugs in the code

Questions # 37:

Which are obligatory scrum events?

Options:

A.

sprint retrospective

B.

sprint goal meeting

C.

backlog refinement

D.

sprint planning

E.

sprint review

F.

daily scrum

Questions # 38:

What are three of the best ways to address non-functional requirements?

Options:

A.

Handle them during a risk mitigation phase before development

B.

Scrum is for functional, frontend development only

C.

Include them in the Product Backlog

D.

Before the release, they should be tested and validated in a hardening sprint

E.

Specific expectations can be used as acceptance criteria to specific product backlog items

F.

Important, recurring non-functional requirements can be added to the definition of done

Questions # 39:

When do the developers participate in the product backlog refinement?

Options:

A.

Never, it is the sole responsibility of the Product owner to refine the backlog

B.

Only during the sprint planning

C.

Anytime during the sprint

D.

Only during the refinement meetings planned by the PO

Questions # 40:

What are possible benefits from practicing Test-Driven Development? (choose the best three answers)

Options:

A.

It is a great way for Testers to contribute early in the Sprint as they can start creating all the tests from the beginning.

B.

It increases collaboration between Developers as it requires Pair Programming.

C.

It helps to identify gaps in understanding the desired behavior.

D.

It might lead to better code as refactoring is part of the Test-Driven Development cycle.

E.

It helps break down complex problems into smaller ones that are much easier to be tackled.

F.

It makes Integration Tests obsolete and by doing so saves a lot of time.

Viewing page 4 out of 5 pages
Viewing questions 31-40 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.