Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Veritas InfoScale VCS-256 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam VCS-256 Premium Access

View all detail and faqs for the VCS-256 exam


817 Students Passed

90% Average Score

93% Same Questions
Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions
Questions # 21:

An administrator is notified that a service group faulted due to a disk group failure.

Which two Veritas Cluster Server logs can the administrator review to determine the reason for the failure? (Select two.)

Options:

A.

vcs_A.log

B.

DG_A.log

C.

FailEvents_A.log

D.

engine_A.log

E.

DiskGroup_A.log

Questions # 22:

Which two capabilities can an administrator use to ensure availability within Docker Containers? (Select two.)

Options:

A.

provide HA to the application within the container for failover and app restart

B.

provide provisioning of a new container when an application within the container fails

C.

first restart the application within the container and if continued app failures then provision a new container

D.

provide HA to the container and move it between cluster nodes

E.

provide provisioning of a new container when a container fails

Questions # 23:

Which command can an administrator run on each node to gather logs containing information on the installed software, cluster configuration, systems, logs, and related information to create a file for Veritas Technical Support analysis?

Options:

A.

/var/VRTSvca/logs/logcollect

B.

/opt/VRTSvca/bin/hagetcf

C.

/opt/VRTSvca/bin/nodedump

D.

/opt/VRTSvca/bin/haconfig -dump

Questions # 24:

An administrator wants to place an existing application under high availability control. Which requirement must be met to place the application under high availability control?

Options:

A.

The application must have defined start, stop, and monitor procedures.

B.

The application must have an unlimited license model.

C.

The application must have an enterprise agent available on SORT.

D.

The application must run in kernel space.

Questions # 25:

Due to a high security risk, a mandatory shutdown of Ethernet switches is scheduled in a data center where the switches are used for two private heartbeat links on a local cluster. A low-priority heartbeat link, which has been configured over a public interface, is unaffected by the shutdown. I/O fencing is disabled.

Which cluster behavior is expected when the private switches are both shut down for the upgrade?

Options:

A.

All nodes in the cluster panic.

B.

The cluster remains online, but the service groups go offline.

C.

Private cluster communications are rerouted over the public network.

D.

The service groups go into ADMIN-WAIT state.

Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.