Questions # 1:

A loudspeaker with sensitivity 90 dB SPL measured at 1 meter, 1 watt Is placed 2 meters away from a listener. At 1 watt, what Is the SPL at the listener?

Question # 1

Options:

A.

81 dB SPL

B.

84 dB SPL

C.

87 dB SPL

D.

90 dB SPL

Questions # 2:

A customer wants to reuse existing network cabling to extend audio and video signals in a system refresh. What is the PRIMARY concern?

Options:

A.

cable color

B.

cable labeling

C.

cable condition

D.

cable connection

Questions # 3:

Which kind of drawing should a technician refer to in order to determine how to hang a loudspeaker line array?

Options:

A.

detail

B.

section

C.

elevation

D.

reflected ceiling plan

Questions # 4:

What does a compressor control in an audio system?

Options:

A.

phase

B.

directivity

C.

frequency

D.

dynamic range

Questions # 5:

For a design-bid (tender)-build project, the final step for determining the owner's costs for an AV system is

Options:

A.

selecting an Integrator.

B.

performing a needs analysis.

C.

having the owner approve the design.

D.

ensuring the equipment specification is ready for bid.

Questions # 6:

The purchaser in an AV solutions firm has a key role to play in the area of

Options:

A.

estimating manpower availability and scheduling.

B.

coordinating project documentation and commissioning.

C.

communicating with vendors and internal staff members.

D.

reviewing the customer needs analysis to determine best solutions.

Questions # 7:

During an initial meeting with a prospective client regarding an audiovisual project, it is important to understand the customer's method of procurement in order to avoid.

Options:

A.

making commitments with regard to delivery times for equipment.

B.

designing the system beyond the budgetary constraints of the client.

C.

missing some of the important components that will be included in the final project.

D.

expending time and resources designing a project that may ultimately go to bid (tender).

Questions # 8:

A client has ordered a large project from a company. This project has several critical components and a fixed schedule. Which of the following will be VITAL for ensuring that the company meets the deadlines?

Options:

A.

proper job costing

B.

confirming lead times

C.

qualifying the customer

D.

confirming price changes

Questions # 9:

Which of the following is an example of PPE?

Options:

A.

fiberglass ladder

B.

high visibility vest

C.

virtual reality headset

D.

company branded polo

Questions # 10:

When planning video content with a client, it is important to get their Pantone data (PMS) to ensure

Options:

A.

the displayed colors match printed colors.

B.

their confidence monitor size is large enough.

C.

the displayed logo is the proper size and style.

D.

the displayed type face is the correct size and style.