Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the AVIXA Communications Certifications CTS Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam CTS Premium Access

View all detail and faqs for the CTS exam


858 Students Passed

92% Average Score

98% Same Questions
Viewing page 3 out of 8 pages
Viewing questions 21-30 out of questions
Questions # 21:

Assuming that the screen and projector are both Ethernet controllable devices, where does the control system for the AV solution need to exist?

Options:

A.

connected to the network

B.

in the rear projection room

C.

in a dedicated rack in the room

D.

above the projector, plugged into the serial port on the projector

Questions # 22:

When compared to Listener 4, which listener simultaneously hears the speaker at +6db? Select the answer by clicking on the correct listener.

Question # 22

Options:

Questions # 23:

Identify the cable which is LEAST susceptible to electromagnetic interference. Select the appropriate cable by clicking anywhere on the correct cable.

Question # 23

Options:

Questions # 24:

The installation of a complex AV project is planned to be completed within 6 months. What is the MOST cost-effective plan for ordering the equipment for the project?

Options:

A.

Order everything as soon as the contract is signed.

B.

Place the order 5 days before the scheduled day for starting installation.

C.

Order each piece of equipment to be delivered as soon as possible.

D.

Order equipment to be delivered on a "just in time" basis according to the installation schedule.

Questions # 25:

What is the difference between the audio system's operational level and the maximum level the system can attain?

Options:

A.

noise floor

B.

headroom

C.

directivity index

D.

loudspeaker sensitivity

Questions # 26:

Which of the following is the MOST SUITABLE security method for a small portable projector?

Options:

A.

cable lock

B.

security screws

C.

adjustable mount

D.

Nylock nuts and bolts

Questions # 27:

Assuming a 10' (3 m) ceiling, what is the approximate volume of this room?

Question # 27

Options:

A.

300 cubic ft (8.5 m3)

B.

600 cubic ft (17 m3)

C.

1500 cubic ft (42.5 m3) o

D.

6000 cubic ft (162 m3)

Questions # 28:

When specifying a paging system for a large building, what kind of speaker system should be recommended?

Options:

A.

near field

B.

line array

C.

direct coupled

D.

constant voltage

Questions # 29:

The AV Project Manager is responsible for

Options:

A.

schedule, budget, scope.

B.

design, schedule, configuration.

C.

budget, installation, maintenance.

D.

configuration, scope, maintenance.

Questions # 30:

Remotely monitoring system health of a deployed conference room and rebooting it when faulty is an example of

Options:

A.

a service call.

B.

troubleshooting.

C.

a service contract.

D.

proactive maintenance.

Viewing page 3 out of 8 pages
Viewing questions 21-30 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.