Questions # 31:

When designing a backbone distribution system, you will need to include a telecommunications enclosure (TE). A TE can be defined as a:

Options:

A.

Splice point for copper cabling only

B.

Point where the backbone cabling interfaces to the horizontal cabling and may be utilized in place of a traditional Telecommunications Room (TR)

C.

Location for housing building cross-connect cabling only

D.

Location to house the splice transitioning from outdoor to indoor cabling only

E.

Facility to store slack copper and fiber cables

Questions # 32:

Rack mounted hardware is installed in two standard sized racks or cabinets. Those sizes are:

Options:

A.

482 mm (19 in) and 584 mm (23 in)

B.

482 mm (19 in) and 762 mm (30 in)

C.

610 mm (24 in) and 762 mm (30 in)

D.

762 mm (30 in) and 914 mm (36 in)

E.

482 mm (19 in) and 1020 mm (40 in)

Questions # 33:

When designing a connection to an outlying building you decide to choose a physical ring. Your primary reason for considering a physical ring is:

Options:

A.

You have easy access to an existing pathway

B.

The design is quick and easy to install

C.

The campus suits this design

D.

The design is cost effective

E.

The physical ring provides a redundant cable path for disaster recovery

Questions # 34:

In the customer's environment, an ITS designer should avoid the need for optical fiber field splicing by:

Options:

A.

Installing oversized inner duct

B.

Using oversized cable trays

C.

Using pre-connectorized cables

D.

Installing a continuous length of cable

E.

Using multiple pull boxes

Questions # 35:

When installing a heavy backbone cabling vertically, recommended methods of securing the cable include all of the following EXCEPT:

Options:

A.

Tie wraps

B.

Brackets

C.

Steel or plastic straps

D.

Collar or mesh basket grips

E.

Steel cable ties

Questions # 36:

Which of the following is NOT a form of signal coupling between two (2) circuits?

Options:

A.

Conductive

B.

Inductive

C.

Reactive

D.

Capacitive

E.

Electromagnetic

Questions # 37:

The electromagnetic spectrum of visible light lies in the ___________ frequency range of the spectrum.

Options:

A.

1 GHz

B.

100 GHz

C.

10 THz

D.

1 PHz

E.

100 PHz

Questions # 38:

You are required by architectural design to place UTP cables in the same space as unshielded power lines. How should you proceed with the placement of your cables?

Options:

A.

Require the architect/electrical engineer to place shielding in the space before your UTP is placed.

B.

You should provide a minimum separation of 610 mm (24 in).

C.

You should provide a minimum separation of 229 mm (9 in).

D.

You should provide a minimum of two 101 mm (4 in) RMC.

Questions # 39:

The potential for ______ occurs when devices or systems share a common electromagnetic environment and their operational frequencies overlap.

Options:

A.

Electromagnetic interference (EMI)

B.

(EMC)

C.

Radio frequency interference (RFI)

D.

Fast transients

E.

Electrostatic discharge (ESD)

Questions # 40:

Which of the following is an undesirable electromagnetic effect on a device(s)?

Options:

A.

(EMC)

B.

Electromagnetic interference (EMI)

C.

Radio frequency interference (RFI)

D.

Fast transients

E.

Electrostatic discharge (ESD)