Questions # 1:

Question # 1

Refer to the exhibit. A Cisco Nexus Dashboard Fabric Controller has been deployed to manage the configuration of the LAN through the management interface MgmtO of a Cisco Nexus switch Cisco Nexus Dashboard Data interface is Layer-2 adjacent to the Nexus switch MgmtO Interface. Which IP address must be allocated to the MgmtO interface?

Options:

A.

172.18.1.10/24

B.

192.168.2.1/24

C.

10.17.10.10/24

D.

10.5.74 10/24

Questions # 2:

Which Cisco Nexus console line interface is shown in this output?

switch# dir bootflash:

25863680 Sep 23 12:02:16 2020 m9250-sSek9-kickstart-mz.8.2.1.bin

25864704 Sep 05 12:21:26 2021 m9250-s5ek9-kickstart-mz.8.2.1.bin

29869312 Apr 01 12:29:34 2021 m9250-sSek9-kickstart-mz.8.2.2.bin

25869312 Apr 12 01:55:22 2021 m9250-s5ek9-kickstart-mz.8.2.2.bin

25947136 Nov 09 13:41:43 2021 m9250-s5ek9-kickstart-mz.8.3.1.bin

29970176 Jan 17 14:10:47 2021 m9250-sSek9-kickstart-mz.8.3.2.bin

26126848 May 07 11:51:20 2021 m9250-s5ek9-kickstart-mz.8.4.1.bin

[output omitted]

Usage for bootflash://sup-local

1050153904658 bytes used

638636406560 bytes free

Options:

A.

Guest shell

B.

Bash shell

C.

NX-OS CLI

D.

NX-OS kickstart CLI

Questions # 3:

Question # 3 An engineer must perform an initial configuration of VXLAN Tunnel End-Point functionality on the Cisco Nexus 9000 Series platform All the necessary features are already enabled on the switch Which configuration set must be used to accomplish this goal?

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Questions # 4:

An engineer must implement Strict Unicast Reverse Path

Forwarding mode for IPv4 packets on the Ethernet1/1 interface on the Cisco Nexus 9500 Series Switch. Which configuration achieves this goal?

A)

Question # 4

B)

Question # 4

C)

Question # 4

D)

Question # 4

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Questions # 5:

Question # 5

Refer to the exhibit During a vPC peer switch reload, there is packet loss between the server and the router Which action must be taken to prevent this behavior during future reloads?

Options:

A.

Set the routed uplink ports of the Cisco Nexus peers as orphans.

B.

Increase the vPC delay restore timer.

C.

Decrease the OSPF hello and dead interval timers.

D.

Disable vPC ARP synchronize on the vPC peers.

Questions # 6:

Question # 6

Refer to the exhibit A network administrator experiences these issues with the network:

    PC1 is experiencing a buffering problem for video applications

    The servers that are connected to SW2 are experiencing packet drops when they connect to the Internet

The engineer wants to configure the required traffic capture to investigate the issue further Which configuration must be implemented to monitor the traffic?

Question # 6

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Questions # 7:

An engineer must implement private VLANs for a group of Cisco UCS 8-Series servers. The primary VLAN is present, But the secondary VLAN must Be added to Both fabrics. Which configuration set accomplishes this task?

Question # 7

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Questions # 8:

An engineer implements an ACI fabric and must implement microsegmentation of endpoints within the same IP subnet using a network-based attribute. The attribute mapping must allow IP subnet independence. Which attribute must be selected?

Options:

A.

MAC address

B.

Custom

C.

Tag

D.

IP

Questions # 9:

An online retailer uses 200 cloud-hosted virtual machines (VMs). Currently, the configuration of each VM is performed manually. To support the growth strategy of the retailer, the retailer starts to automatically scale the VMs to meet demand and uses Ansible for configuration management. Which action must be performed in Ansible to meet the requirements before automation is performed?

Options:

A.

Configure a dynamic inventory plug-in.

B.

Set up and configure Ansible Tower.

C.

Add each VM to the .ini inventory file.

D.

Register each VM in Ansible

Questions # 10:

An engineer must upgrade the server firmware for which the service profile is configured with a host firmware package. Which action must be taken to accomplish this goal?

Options:

A.

Change the maintenance policy to user-ack and upgrade.

B.

Perform a direct upgrade on the server using Auto Install.

C.

Disassociate the service profile from the server and upgrade.

D.

Upgrade the server through the host firmware package.

Viewing page 1 out of 6 pages