Summer Certification Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code = getmirror

Pass the Huawei HCS-Pre-sales H19-371_V1.0 Questions and answers with ExamsMirror

Practice at least 50% of the questions to maximize your chances of passing.
Exam H19-371_V1.0 Premium Access

View all detail and faqs for the H19-371_V1.0 exam


805 Students Passed

93% Average Score

98% Same Questions
Viewing page 13 out of 13 pages
Viewing questions 181-195 out of questions
Questions # 181:

Huawei FusionPower6000 is used with which of the following UPS products ().

Options:

A.

UPS5000-E

B.

UPS5000-S

C.

UPS5000-A

D.

UPS5000-H

Questions # 182:

When the Netfco management system adopts the single 6RH1585 server, it can support the maximum access (10,000 test points, so as to realize the centralized management of multiple data centers?

Options:

A.

20

B.

40

C.

50

D.

100

Questions # 183:

The current core views of Huawei's iccooling concept are: ( ).

Options:

A.

Control air conditioner through iphone

B.

L0L1L2 layer linkage, faster demand feedback and more accurate cooling.

C.

Cooperate with Apple to solve the cooling problem

D.

Using chip-level cooling to more accurately match the heat source

Questions # 184:

What is the size of the screen of the air conditioner of Fusionmodule2000? ( )

Options:

A.

5 inches

B.

7 inches

C.

9 inches

D.

10 inches

Questions # 185:

What is the maximum IT load supported by the FusionModule2000 integrated UPS? ( )

Options:

A.

125KW

B.

150KW

C.

75KW

D.

50KW

Questions # 186:

The NetEco6000 management system can manage the devices inside the FusionModule and outside the module at the same time. In the default recommended solution, the

devices inside the FusionModule use the ( ) collector to access the device, and the devices outside the module use the ( ) collector. to access the device?

Options:

A.

ECC500, ECC500

B.

ECC500, ECC800

C.

ECC800, ECC500

D.

ECC800, ECC800

Questions # 187:

The maximum number of cabinets supported by a single module of FusionModule2000 is (

Options:

A.

40

B.

48

C.

50

Questions # 188:

What kind of circuit breaker is used in the main circuit of PDU8000 precision power distribution cabinet: ( ).

Options:

A.

Molded case circuit breaker

B.

Miniature circuit breakers

C.

Frame Breaker

D.

Disconnect switch.

Questions # 189:

UPS5000-E can easily realize N+X power supply system by only selecting ( ) , and the operation is simple and convenient. .

Options:

A.

BSC cable

B.

Parallel cable

C.

BSC Control Board

D.

Parallel card

Questions # 190:

Does the FusionModule800 channel have a skylight?

Options:

A.

have

B.

None

Questions # 191:

UPS000-A/E 400KVA and above models are divided into standard version and enhanced version, of which the standard version comes standard with ( ) isolating switch

Options:

A.

Main input

B.

Bypass Input

C.

Maintenance

D.

output

Questions # 192:

The NetCol5000-A042H full-cabinet row-level air-cooled variable frequency precision air conditioner supports a cooling capacity adjustment range of ( ), which can continuously cool under low load in the afternoon and avoid temperature

and humidity fluctuations and unit reliability problems caused by frequent start and stop.

Options:

A.

10~100

B.

15~100

C.

20~100

D.

25~100

Questions # 193:

The wrong description about the reliability of NetCol5000-C row-level air conditioner is:

Options:

A.

It adopts dual power supply, and the two power supply adopts automatic switching mode

B.

Operators, large data centers such as large corporate headquarters prefer this type of air conditioner, and small and medium-sized enterprises are more likely to use NetCol5000-A air conditioners

C.

Multi-fan air supply: online maintenance is possible

D.

Cannot be used in scenarios without raised floor, because condensate drainage cannot be connected to the pipe

Questions # 194:

What is the maximum IT load and how many power modules can the FusionModule2000 integrated UPS support?

Options:

A.

125KW, 5 25KVA power modules

B.

150KW, 6 25KVA power modules

C.

125KW, 6 25KVA power modules

D.

150KW, 7 25KVA power modules

Questions # 195:

The NetEco management system can support deployment on () virtual machine software, and save the procurement of servers through virtualized deployment?

Options:

A.

MS Hyper-V

B.

VMware

C.

KVM

D.

Parallels

Viewing page 13 out of 13 pages
Viewing questions 181-195 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.