Questions # 11:

Which of the following would be the most significant input to estimating the time to carry out the specified testing tasks? 3 credits

Options:

A.

The skills and experience of developers to correct the failures.

B.

The standards used for the requirements specification.

C.

The metrics recorded from testing the capture-replay tool.

D.

The number of testers in the company and their grade.

Questions # 12:

Which of the following are valid reasons for adopting a different life cycle (from the V model), for increments after the first year? 2 credits

i. We do not have a clear understanding of the requirements from a customer perspective.

ii. We see the risk of delivering requested functionality late as being higher than the risk of delivering a lower quality product.

iii. We do not have a budget for additional regression testing which is needed to ensure that existing functionality is not compromised by future iterations.

iv. The company test strategy does not fit well within the V life cycle model.

Options:

A.

(i) and (ii)

B.

(i) and (iv)

C.

(ii) and (iii)

D.

(ii) and (iv)

Questions # 13:

Which of the following is a characteristic of good testing in any life cycle model? 1 credit

Options:

A.

Analysis and design of tests begins as soon as development is completed.

B.

Some, but not all, development activities have corresponding test activities.

C.

Each test level has test objectives specific to that level.

D.

All document reviews involve the development team.

Questions # 14:

Which of the following would you expect to see in the master test plan? 1 credit

Options:

A.

A description of how the test cases are cross-referenced to requirements in the test management tool.

B.

A detailed identification of the resources that will carry out structural testing in the first iteration.

C.

The test approach that will be applied at system integration testing.

D.

A list of the names of the testers who will carry out the performance testing for the final iteration.

Questions # 15:

Which of the following would be the TWO most appropriate examples of entry criteria documented in the system integration test plan? 2 credits

Options:

A.

The percentage of decision coverage achieved during unit testing.

B.

The availability of the latest version of the capture-replay tool (for testing the interface with the newly developed test management tool).

C.

The sign-off of a performance test software release note (test item transmittal report) by both development and testing showing that system performance meets the specified acceptance criteria.

D.

The percentage of acceptance test procedures scheduled for execution.

E.

The percentage of requirements coverage achieved during system integration test.

Questions # 16:

Which one of the following estimation approaches is appropriate at this stage of the project? 2 credits

Options:

A.

Create an estimate based on the function point analysis technique and test point analysis

B.

Create an estimate based on the complexity of the code

C.

Create an estimate based on the credentials of the successful bidder

D.

Create an estimate based on a percentage of the development effort

Questions # 17:

Evaluate the status of the project against the defined exit criteria. Which of the following options shows the correct status? 2 credits

Options:

A.

Criteria A = OK, criteria B = OK, criteria C = OK

B.

Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK

C.

Criteria A = OK, criteria B = NOT OK, criteria C = NOT OK

D.

Criteria A = NOT OK, criteria B = NOT OK, criteria C = NOT OK

Questions # 18:

Which of the following phases in the fundamental test process is considered to deliver a document which can be used as a major input for test process improvement? 1 credit

Options:

A.

Test planning and control

B.

Test implementation & execution

C.

Evaluating exit criteria and reporting

D.

Test project closure

Questions # 19:

During test process improvement it is recommended to use standards where possible. Standards originate from various sources and they cover different subjects in relation to testing Pick TWO sources of software standards, useful to software testing from the ones mentioned below. 1 credit

Options:

A.

ISO 9126-1 ‘Software engineering- Product quality Part 1:

Quality model’ is an international standard, that provides a basis on which to define quality assurance solutions.

B.

ISA 4126-1 ‘Software engineering- Product quality Part 1:

Quality model’ is an international standard, that provides a basis on which to define quality assurance solutions.

C.

BS-7925-2 ‘Software testing. Software component testing is a national standard used internationally. It covers a number of testing techniques that may be useful both on component testing level and on system testing level.

D.

SY-395-01 ‘Standard for East Coast Hospital software’ is a regional standard adapted from a national one. Besides hospital software, this standard ought to be used also by other types of software system in the region.

E.

IEEE 829 ‘standard for software test documentation’ is an international standard to be following mandatory by all testing origination regardless of lifecycle models.

Questions # 20:

Which THREE activities would be valid steps during the development of the test strategy?2 credits (2 out of 3 correct 1 credit)

Options:

A.

Identify test staff members that will be involved in the system test

B.

Define test career paths

C.

Understand the software development life cycle used by the software house

D.

Assess the testing that needs to be done to minimize the risks

E.

Issue the test strategy document for review

F.

Define a master test plan template

G.

Perform a project risk analysis

Viewing page 2 out of 6 pages
Viewing questions 11-20 out of questions
TOP CODES

TOP CODES

Top selling exam codes in the certification world, popular, in demand and updated to help you pass on the first try.