Questions # 31:

Risks should be constantly reviewed. Given the current situation, which one of the following factors is most likely to lead to a revised view of product risk? 3 credits

Options:

A.

The concerns over the user interface may lead to changes to the interface which cannot be implemented by development in time for the second test iteration.

B.

The concerns over the user interface raises the likelihood of a risk in that area and increases the amount of test effort needed for the user interface, thereby limiting the test effort available for other parts of the test management tool.

C.

The delivery of the application without the interface changes may upset the user community.

D.

The method used for test estimation is not accurate enough and hence the money spent on testing exceeded its budget.

Questions # 32:

Which of the following is least likely to be used as a technique to identify project and product risks? 1 credit

Options:

A.

Brainstorming

B.

Inspections

C.

Expert interviews

D.

Independent assessments

Questions # 33:

Which test management control option is most appropriate to adopt under these circumstances? 2 credits

Options:

A.

Introduce mandatory evening and weekend working to retrieve the 3 week slippage.

B.

Reconsider the exit criteria and review the test plan in the context of the current situation.

C.

Advise the user community regarding the reduced scope of requirements and the additional incremental delivery.

D.

Arrange a meeting with the user community representatives to discuss the user interface.

Questions # 34:

Which of the following is a project risk mitigation step you might take as test manager? 1 credit

Options:

A.

Testing for performance problems

B.

Hiring a contractor after a test analyst leaves the company

C.

Arranging a back-up test environment in case the existing one fails during testing

D.

Performing a project retrospective meeting using the test results after each increment

Questions # 35:

The test improvement project will take place in an organization developing a safety-critical avionics application. Which one of the following standards do you believe would be most appropriate to take into account for compliance during your assignment? 1 credit

Options:

A.

ISO 9126

B.

IEEE 829

C.

BS 7925/2

D.

DO-178B

Questions # 36:

Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed.

Question # 36

Based on the chart above, what is the most appropriate next test phase? 1 credit

Options:

A.

Acceptance testing to verify the business process

B.

Acceptance testing to verify operational requirements

C.

Requirements testing as part of testing regulatory compliance

D.

Another system test cycle to verify defect resolution

Questions # 37:

Given the following figures for the testing on a project, and assuming the failure rate for initial tests remains constant and that all retests pass, what number of tests remain to be run? 3 credits

Question # 37

Options:

A.

700

B.

720

C.

784

D.

570

Questions # 38:

Continuing with the Scenario described in the previous question, which of the following topics would you need to address in detail in the master test plan? 3 credits

Options:

A.

An approach to regression testing

B.

A list of boundary values for “advance amount”

C.

A description of dependencies between test cases

D.

A logical collection of test cases

Questions # 39:

Relying only on the information provided in the scenario, select the TWO items and/or features for which sufficient information is available to proceed with test design. 2 credits

Options:

A.

All supported credit cards

B.

Language localization

C.

Valid and invalid advances

D.

Usability

E.

Response time

Questions # 40:

Which of the following team roles would be most appropriate to enhance the team and why? 2 credits

Options:

A.

A person with the ability to complete tasks

B.

A quality assurance officer

C.

A person with in-depth technical skills

D.

A person who brings new ideas to the team